Showing posts with label self regulation. Show all posts
Showing posts with label self regulation. Show all posts

Monday, November 5, 2012

HEA Members Forum Update

HEA/AEEC Meeting ChangeThis month's meetings are scheduled for
Tuesday, November 6, 2012
9:00 AM -- Finance Committee
1:00 PM -- Operations and Special Projects 
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Meetings normally take place on the second Tuesday of each month.


Location: Kenai Offices at 280 Airport Way. Video conferencing is available in the Homer Offices at 3977 Lake Street, 907-235-8551. Draft agendas are now available on the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx. There are sometimes last minute changes in scheduling, so check the website.

2013 Budget (finance committee meeting)
Staff will present a Draft 2013 Budget for Board consideration in preparation for a November 27 budget workshop at 10 AM in the Kenai Board Room.

HEA/AEEC Loan Balances (finance committee meeting)
There will also be discussion of the cooperatives' indebtedness as of September 30, 2012.

Changes to HEA/AEEC Meetings Framework (operations committee meeting)
The Board is considering changing the times and format of future committee and Board meetings. One idea would involve combining AEEC committee with AEEC Board meetings and HEA committee with HEA Board meetings. The two would then be scheduled during the work day to eliminate the 5:30 evening meeting time.  

Alaska Railbelt Cooperative Transmission & Electric Company (operations committee meeting)
There also will be an update on ARCTEC and HEA participation.

Natural Gas Supply (HEA Board meeting)
HEA Member Tom Patmor will make a presentation on the Natural Gas Supply issue.

Don't Forget the HEA Energy and Conservation Fair

Monday, October 15, 2012

HEA Members Forum Update

Regular HEA/AEEC Meetings
Tuesday, October 16, 2012
10:45 AM -- Operations and Special Projects

1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Location: Starting this month meetings take place in the Kenai Offices at 280 Airport Way. Video conferencing is available in the Homer Offices at 3977 Lake Street, 907-235-8551. Draft agendas are now available on the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx. There are sometimes last minute changes in scheduling, so check the website.

HEA Energy and Conservation Fair
Saturday November 3, 2012, 10:00 AM to 4:00 PM, Kenai Middle School
Saturday November 10, 2012, 10:00 AM to 4:00 PM, West Homer Elementary School
Workshops, demonstrations, speakers, and exhibitors related to all aspects of energy alternatives and conservation.

Rate Increase
As of October 1 the Cost of Power Adjustment (COPA) increased from 3.603 to 4.884 cents per kWh. This raised your blended rate from 16.362 to 17.643 cents/kWh, or about $8.07 for a member using 630 kWh/month.The increase is due to lower than anticipated power availability from Bradley Lake due to maintenance work and improvements requiring longer than expected, increasing purchase of more expensive natural gas based energy.

Expected Rate Increase
If HEA decides to participate in Chugach Electric Association's new Southcentral Power Project, our wholesale cost of power is expected to increase by almost 5%. Pending RCA approval, the increase could be expected as of January 1, 2013. This is a first taste of how construction of new generation assets will begin increasing your electric rates in the near future.

HEA Line Extension Change
A Design and Engineering Agreement and Construction Agreement along with associated language for the proposed new line extension tariff has been filed with the RCA. A decision was expected as of October 8, 2012 but there is no word from HEA yet. Go to http://www.homerelectric.com/NewsEvents/CurrentNews/tabid/125/Default.aspx to download highlights of the proposed changes and RCA/HEA filing documents.

Thursday, July 5, 2012

HEA Members Forum Update‏

Regular HEA/AEEC Meetings
Tuesday, July 10, 2012
10:00 AM -- Operations and Special Projects
1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Location: Meetings take place in the Homer Offices at 3977 Lake Street, 907-235-8551.  Video conferencing is available in the Kenai Offices at 280 Airport Way.  Draft agendas should available at least a day before meetings on the HEA website athttp://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx. There are sometimes last minute changes in scheduling, so check the website.

Rate Reduction
As of July 1 HEA's Cost of Power Adjustment (COPA) fell from $0.04997 to $0.03603 per kWh. This lowered your "blended rate" (COPA plus energy rate) from $0.17756 to $0.16362 per kWh. That's a $0.0139 per kWh reduction -- savings of $8.78 for a 630 kilowatt hour month.

What's In a Name?
After all the heartburn caused by adoption of the 150 kWh "minimum energy charge" HEA got the Regulatory Commission of Alaska to allow the name to be changed to "system delivery charge (SDC)." Either way it's all the same -- part of the real expense HEA incurs in maintaining all the equipment and facilities required to keep power flowing to your meter. You pay some more toward this expense through the monthly $15.00 customer charge. Since the amount of SDC can rise with your per kWh charge, the RCA limits the combined SDC and customer charge to $38.00 per month. While the minimum energy charge was formerly printed on every bill, even if zero kWh was billed, after August 1st. the SDC will print only on consumers’ bills that are eligible to receive the charge. Most HEA members will not see the SDC on their bill.

Net metering customers have been exempt from the minimum energy charge and will continue to be exempt from the SDC.  

Line Extension Policy Change
Review of the present line extension charges show that during the past six years, HEA invested over $2.6 million in developer projects resulting in zero kilowatt hour sales. Since these projects are not generating any revenue for our cooperative, the costs must be recovered through all HEA member rates. Earlier this year a new line extension policy designed to address the problem was sent to the Regulatory Commission of Alaska. If added to the HEA tariff the new policy would increase charges for putting in electric service, especially for real estate developers. In the face of opposition from some developers the proposal has been withdrawn until next fall to allow HEA and RCA staff to look at ways to address those concerns. 

Grass Roots Clean Energy Agenda
WASHINGTON, D.C. – June 27, 2012 – Fed up with the undue influence of the energy companies, utilities, lobbyists and other interests that are making it impossible for Washington to move forward decisively in achieving America’s clean energy future, 36 citizen organizations with more than 1.1 million combined members are joining forces to advance a nine-point “American Clean Energy Agenda” and to push for a serious renewable energy agenda no matter who is the next President or which party controls Congress.

Check out this interesting article forwarded to us by HEA Board of Directors Deputy Secretary, Jim Levine.
http://www.homerelectric.com/BoardofDirectorsElections/MeettheBoardofDirectors/tabid/254/Default.aspx 

Thursday, June 28, 2012

Special Alaska Electric & Energy Cooperative Board Meeting

Special Alaska Electric & Energy Cooperative Board Meeting
9:00 AM
Friday, June 29, 2012

Kenai HEA Board Room (
video conferencing from Homer offices)

This special meeting of HEA's generation and transmission arm was called to discuss and vote on approval of a contract for the Soldotna power plant construction, Phase 3 (Combustion Turbine Installation).
 The meeting is expected to last 30-45 minutes with the bulk of it in Executive Session.  

Thursday, December 8, 2011

HEA/AEEC Meetings Tuesday, December 13, 2011

10:00 AM -- Operations and Special Projects
1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Warning: On the meeting calendar page of the HEA website when you "hover" the cursor over a meeting title an incorrect time is displayed. For example, 9:00 AM will be shown as the Operations Committee starting time. Click on the meeting title to get the right time.

Location: Meetings take place in the Kenai Offices at 280 Airport Way. Video conferencing is available in the Homer Offices at 3977 Lake Street, 907-235-8551. Draft agendas should be available prior to meetings on the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx
. There are sometimes last minute changes in scheduling, so check the website.

Your HEA Account Number is Being Changed
To accommodate the growing number of HEA members all account numbers will gain an additional digit. For example, if your account number was 12345-01 it will now be 12345-001. Check your next HEA statement for your new number and be sure to use it when referring to your account. Don't forget to notify your bank or other bill pay service of the change too. Contact HEA Member Services if you have questions (907-283-5831, 907-235-8551, 800-478-8551).

AEEC Meeting Minutes Now Available
The Alaska Electric & Energy Cooperative, Inc. is HEA's generation and transmission arm. HEA and AEEC Directors are the same people. Most of the major expenses for the Independent Light project have been incurred in the name of AEEC. While HEA Board meeting minutes have been posted for some time, AEEC meeting minutes were not available until now. HEA Members Forum has encouraged HEA staff and Board to post these and other information about AEEC for at least two years. Unfortunately, the minutes do not reflect how individual Directors have voted on various resolutions or include copies of those documents. Without such it is difficult for HEA members to evaluate Director performance but one can at lease get a sense of what transpired and when specific decisions were made. So, Kudos to Directors Debbie Debnam and Jim Levine for helping HEA take this step toward somewhat greater transparency. Go to http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/AEECMinutes/tabid/302/Default.aspx for the minutes.

Monthly HEA Manager's Reports
Remember that you can download copies of Brad Janorschke's short monthly summary of recent coop developments and actions.  Each report serves as the core of an update presented to Directors at the monthly HEA/AEEC meetings. While not as detailed as the in-person reports, website versions provide some useful information for any HEA member interested in tracking what management has to say about the coop. Go to http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/ManagersReports/tabid/222/Default.aspx and click on the date of the report(s) you want.

New HEA Rate Plan Coming January 1
There will be a single energy rate for all residential members with a new 150 kWh minimum charge and the present $11 per month customer charge will increase to $15.  The HEA billing system may not be ready by then to accommodate the new minimum energy charge. In that case HEA will request a waiver from the Regulatory Commission of Alaska to postpone adding the energy minimum until billing software upgrades are completed.
           
Grant Lake/ Grant Creek Hydroelectric Project
Over the last four years HEA members have been pressing the coop to add renewable technology options to our energy "portfolio." HEA management and engineers have not appeared overly eager, however, dragging their feet particularly hard with respect to wind power.  The controversial Grant Lake/Grant Creek small hydro project is HEA's first serious effort to respond to member desire for renewable energy. The project has been in the news quite a bit -- especially in recent months. Field studies must continue through 2012 and until they are completed a construction license application can't be submitted to the Federal Energy Regulatory Commission (FERC). Nonetheless, Kenai Hydro (HEA) recently submitted a grant request to the Alaska Energy Authority for construction money. That strikes some HEA members as proof that management plans to proceed with the project regardless of what the study data indicates. General Manager Brad Janorschke claims that nothing could be farther from the truth. In a September newspaper opinion piece he stated that, "If the studies show that there would be a serious impact to the overall health of the Kenai River watershed, HEA will not proceed with the project." Critics of the project find that difficult to believe, given the request to AEA for construction funds. And many feel the FERC permitting process is more about enabling projects than actually evaluating them on their merits. 

While HEA members seem to want our coop to embrace renewable technology it's probably not just for the bragging rights. Most likely they want to see renewable projects make economic, social, and environmental sense. If built, will the Grant Lake project ultimately prove harmful to the Kenai River watershed ecosystem and the economy of the surrounding area? Or can the project be designed, built, and operated so it doesn't cause undue harm? And either way, will the ultimate cost per kWh be competitive with other options? If you don't know enough about this project to have an opinion why not do a little reading? Then let your HEA Board know how you feel.

Get information and the HEA management perspective.
http://www.kenaihydro.com/index.php or contact Mike Salzetti at 283-2375.

Learn about the Federal Energy Regulatory Commission
(it's mission, and the licensing process)
http://www.ferc.gov/

Get more information and the skeptics' perspective.
Resurrection Bay Conservation Alliance
http://www.rbca-alaska.org/page8/page24/page24.html

Alaska Center For the Environment
http://akcenter.org/forests-and-wildlife/chugach/kenai-hydro

Hydropower Reform Coalition
http://www.hydroreform.org/

Tuesday, April 19, 2011

An Invitation from HEA Members Forum

Please join us for

Human Rights vs. CORPORATE PRIVILEGE
A discussion of Corporate Personhood and the end of American Democracy

Tuesday April 26
6:00-8:00pm
355 West Pioneer Avenue, Homer Alaska

The underlying problem is that corporations, in addition to having all of the rights of people, have rights people don't have - such as incredibly favorable tax laws and limited liability. The combination of these rights has made the corporations more powerful than We The People.
Gershon Cohen
Featured Speaker and Co- founder of Earth Island Institute’s Ultimate Civics Project




For more information contact: Rob Rosenfeld, (907)388-2683 or (907)235-7528, robrosey@gmail.com

Monday, January 24, 2011

HEA Members Forum Update



February HEA/AEEC Meetings
These meetings will take place in Kenai at the Central Peninsula Offices, 280 Airport Way. Video conferencing is available in the Homer Offices at 3977 Lake Street.

Tuesday, February 1, 2011 (tentative)            

2:00 PM -- Operations and Special Projects
Tuesday, February 8, 2011 

1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Check for meeting calendar updates and draft agendas on the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx.

2011 HEA Board Elections
The HEA Board election season is coming. The application period for candidates usually starts in February and runs through the first week in March (the 5th, last year). Ballots go out to members about a week after that and can be returned through early May. This year David Thomas (District 1), Tim Evans (District 2), and Mike Wiley (District 3) must run if they want to stay on the HEA Board. In preparation HEA Resolutions 45.2011.02 (Appointment of Election Committee) and 45.2011.03 (Voting Eligibility Record Date) were passed at the January 18 HEA/AEEC meetings. There was some discussion of the the need to prepare ballot Initiatives for HEA members to vote on. Apparently certain bylaws changes sought by the Board must be approved by the general HEA membership. further discussion was moved to the February meetings -- more detail on this will follow then.

Now is the time for you to be thinking about how satisfied you are with your district’s HEA Director. Would you like to see him continue on the Board for another 3 year term or would you prefer to elect someone new? Maybe you would even like to run yourself.

HEA/AEEC Proposed Rate Plan -- HEA reply
Since the RCA suspended the HEA/AEEC request for approval of the plan (Order U-10-97, Order No. 1), the cooperative has submitted a 19 page brief in defense of the minimum energy charge. In part it argues that if, as stated by the RCA suspension order, the minimum energy charge is in conflict with Alaska Administrative Code 3 AAC 48.805 the RCA should waive requirements that the new rate plan comply. If you want more detail, this and related documents are available on the RCA website at http://rca.alaska.gov/RCAWeb/Entity/EntityDetails.aspx?id=883fd287-5437-45c3-ac93-6611db2d87b0.

Independent Light $$
There have been no significant developments since our January 6 HEAMF update. Alaska Energy & Electric Cooperative Resolution 01.2011.01 (Approval of Construction Work Plan) was passed at the January 18 HEA/AEEC meetings. Most of the plan's $200 million expense is for the Independent Light project ($180 million). The remaining $10 million is primarily for work on Sterling and Bernice Lake substations. AEEC Resolutions 01.2011.02 and 01.2011.03 amending HEA/AEEC loans and agreements with the National Rural Utilities Cooperative were passed. These are technical changes needed to accommodate a drop in “margins” expected during construction of Independent Light facilities (margin is the difference between an electric  cooperative’s costs and revenues).
  
New Regional Generation and Transmission Coop
HEA/AEEC joined Chugach Electric Association, Matanuska Electric Association, Golden Valley Electric Association, and the City of Seward to form the Alaska Railbelt Cooperative Transmission and Energy Cooperative (ARCTEC). Anchorage Municipal Light and Power declined to participate. The Members Forum has long supported greater cooperation between railbelt utilities. Articles of incorporation were filed with the Division of Corporations, business and Professional Licensing (http://www.commerce.state.ak.us/occ/) on December 23, 2010. ARCTEC is an outgrowth of the Greater Railbelt Energy and Transmission Corporation (GRETC) legislation which failed last year. The objective is to have a mechanism to cooperatively pursue projects that are just too large and costly for a single utility. According to HEA manager Brad Janorschke, there will be a strong emphasis on developing large scale renewable energy sources such as geothermal, hydroelectric, and tidal projects. ARCTEC bylaws are presently being developed. HEA Resolution 45.2011.01 (Appointment of ARCTEC Representatives -- Debbie Debnam and Brad Janorschke) was passed at the January 18 HEA/AEEC meetings.

Grant Lake Small Hydro Project
According to General Manager Janorschke the Alaska Energy Authority has approved $1.1 million of a $1.5 million HEA/AEEC grant request for the Grant lake project. He cautioned the Board that this must also be approved by the Legislature, so it’s not a “done deal” yet. This money would help offset ongoing field studies and permit application efforts. The project continues to be very controversial among Moose Pass residents and some HEA members.

Cook Inlet Tidal Power Pilot Project
According to HEA General Manager Brad Janorschke, a hydrokinetic energy company contacted HEA about possible partnership in some kind of pilot project. This could be some place near the Forelands. The company also appears interested in tidal prospects around Kachemak Bay. Janorschke says he was told they would be in touch again soon with some kind of specific plan.  

AKPIRG Utility Work
The Alaska Public Interest Research Group (AKPIRG) is taking an interest in utility consumer affairs and has recently hired a young woman named Kathleen Cogan to work with railbelt ratepayers. A main main part of her work will involve helping utility ratepayers from Golden Valley Electric Association to Homer Electric Association elect or reelect good people to the utility Boards. Kathleen works out of the Anchorage AKPIRG office but will travel to other railbelt communities on a regular basis. She will visit Homer this week where she can be reached at the Cook Inetkeeper offices.

Better Record Keeping ?
At the January 18 HEA/AEEC meetings Mike Wiley continued to press for more detailed meeting minutes. David Thomas expressed concern that putting too much detail into the minutes could be counterproductive. He especially doesn’t think various Directors’ comments prior to voting on resolutions should be included. While many Directors express resistance to putting specifics in the minutes, Jim Levine agreed with Mike Wiley and moved that, at the very least, topics of comments made by HEA members attending meetings should be noted in minutes. The motion was passed.

Fewer Secrets, At Least
HEA resolution 45.2011.04 (Approval of the 2011 Equity Management Plan) was approved at the January 18 HEA/AEEC meetings. HEA/AEEC filed a petition with the Regulatory Commission of Alaska in November to classify it’s 2010 Equity Management Plan confidential. In December the RCA denied that petition (U-10-85, Order No. 2). According to General Manager Janorschke the Commission will now probably require a copy of the EMP be provided for interested members of the public with only legitimately sensitive information redacted. Hopefully this will also apply to the 2011 EMP. 

Tuesday, November 23, 2010

HEA Members Forum Update

Last Chance to Comment on the New HEA Rate Plan
The new HEA rate plan was filed with the Regulatory Commission of Alaska on November 2, 2010. It is undergoing a 45-day review by RCA staff. At the end if this period (around December 17) staff will present recommendations to Commissioners and a docket will be open for further investigation. This will likely include a 20-day public review process. Watch for notice of this if you have concerns or suggestions about the proposed rate plan that you would like to bring before the RCA.

Weigh in on New Energy Efficiency Standards
The RCA is considering adoption of new amendments to the Public Utilities Regulatory Policies Act which are intended to encourage energy efficiency, among other things. As might be expected, the RCA staff suggests against adopting the federal standards but does propose some modest increase in state regulatory support for energy efficiency. You have until December 9 to submit comments. See the attached summary for more information and go to the source at http://rca.alaska.gov/RCAWeb/Dockets/DocketDetails.aspx?id=ccbcfb40-5010-41c7-af3d-d2e42b57241d.




Independent Light -- Not the Brightest Bulb
Through it’s shadow corporation, the Alaska Electric and Energy Cooperative, Inc., HEA approved spending another $4.5 million on equipment and design engineering services for the Nikiski facility and old Soldotna 1 site. Most of this, $3.3 million, went to the latter. For the most part people see the logic in spending money to improve efficiency of the Nikiski plant. But to many, in a situation where the natural gas supply is questionable, spending millions on new stand-by gas turbines for Soldotna seems like a bad choice. All the more so, given that Anchorage Municipal Light & Power offered a power purchase agreement that one HEA Board member reputedly deemed “a pretty good deal.” As one former HEA electrical engineer recently pointed out, it’s unlikely we can ever recover the cost of new Soldotna turbines. With no one but ourselves to sell power to, they will stand idle most of the time and never generate revenue.

Alaska Railbelt Cooperative Transmission and Energy Company (ARCTEC)
HEA and other railbelt utilities continue to work on draft articles of incorporation for this potential confederation aimed at improved collaboration. The stated intent is to improve prospects for dealing with natural gas supply problems, better address transmission issues, and pursue utility scale alternative energy opportunities. According to HEA General Manager Brad Janorschke, utilities hope to come to agreement and file the articles by the end of this month (November). We agree that better collaboration will be needed to effectively meet railbelt energy needs in the coming years. Such efforts are to be commended, assuming that ratepayer interests are being taken into consideration. Unfortunately, as is so often the case, this process is being conducted behind closed doors.

Renewable Double Speak
While all of the HEA Directors say they favor adding more renewable energy sources to our energy mix, General Manager Janorschke has joined with other railbelt utility managers in signing the attached letter to the RCA and legislative leaders complaining that integrating renewable energy into the existing generation scheme is just too difficult. While the letter claims it isn’t a rejection of renewable technologies, it sure comes out reading like one. These utilities have failed to work with each other or potential independent power producers like Fire Island Wind (CIRI) or Kenai Winds to find ways to overcome integration challenges. HEA has committed to spending $180 million (plus) on natural gas generation but only $2-3 million on a single, very controversial, small hydroelectric project and not a dime on technology to balance fluctuations from wind generators. Railbelt utilities predict potentially high costs associated with integrating renewable energy but think nothing of increasing our dependency natural gas, even if we need to import it in liquefied form from outside. Wonder what that’s going to cost?




December HEA/AEEC Meetings
These meetings will all take place in Kenai at the Central Peninsula Offices, 280 Airport Way.

Tuesday, December 7, 2010
2:00 PM -- Operations and Special Projects

Tuesday, December 14, 2010
1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Download draft agendas at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx. Video conferencing is available in the Homer Offices at 3977 Lake Street -- call either HEA office at 283-5831 (Kenai) or 235-8551 (Homer).

Friday, August 6, 2010

HEA Members Forum Update

HEA Plans Rate Structure Change
Every HEA member has a big stake in this ratemaking process. The outcome will affect the finances of Kenai Peninsula families and businesses for the foreseeable future. Electric rates will increase. They jump two percent this October. They're expected to reach 20-25 cents per kWh by 2014. A new rate structure probably can’t prevent that but HEA members should be wondering just what it might do.

Can it be fair to all classes of ratepayers (residential, commercial, industrial) in all areas?
What will it mean for low wage workers and people on fixed incomes?
Will it promote energy efficiency and conservation?
Can it do anything to stabilize electric rates?
Will it be easy for HEA members to understand?

Attend the Ratemaking Workshop on Wednesday, August 18
Come to the HEA Homer Board Room at 9:00 AM -- video conferencing available at Kenai HEA offices for central peninsula members. This will be the last opportunity for you to learn more about three potential residential rate options under consideration:

1. Raise the present $11.00 per month residential customer charge to around $90.00 (the estimated monthly cost to HEA to provide service) and lower the per kWh energy charge.

2. Raise the $11.00 customer charge to $15.00 and increase the per kWh energy charge.

3. Raise the $11.00 customer charge to $15.00 and require a minimum monthly energy payment based upon 300 kWh of electricity ($36.26). All residential customers would then pay at least $52 per month.

Those options are at the core of this process but only reflect part of the background discussion. For example, there is the issue of basic kWh rate design -- should it be uniform or variable based upon differing levels of consumption, peak vs. off-peak use, summer vs. winter? There are other issues too but no space for discussion here.

Now is the Time to Get Involved
A draft rate plan is expected by the end of this month. The plan will be presented to members at September HEA regional meetings. By then the opportunity for input will be limited -- final rate design will be adopted in October. If you want to help determine how the final plan looks, go to the HEA website (http://www.homerelectric.com/) and read Rate Design: Making It Fair and Promoting Conservation. Try to attend the August 17 HEA Board meeting. Participate in the August 18 ratemaking workshop. Ask questions, explain your priorities, and make suggestions.


BASICS OF ELECTRIC UTILITY RATEMAKING
Electric utility rates include two basic charges, one for recovering “fixed costs” and the other for recovering “variable costs.” For this discussion let’s ignore the taxes and surcharges typically tacked on to your electric bill.

Fixed Costs
These include expenses the utility incurs by just having a customer tied into the system -- wire, poles, buildings and everything needed to provide basic service. These costs have nothing to do with how much or how little energy a customer uses and do not fluctuate.

Variable Costs
These include expenses the utility incurs for equipment, over and above the basics, required by high demand customers and for acquiring the energy it distributes to us. These costs vary depending upon how “big” a service capacity is installed for the customer and how much energy is consumed each month.

Utilities generally consider it good policy to recover fixed costs through fixed charges (the “customer charge”) and variable costs through variable charges (the “energy charge” or “per kWh” charges).

Thursday, May 27, 2010

Kenai Hydro Concerns

HEA Members form participants favor renewable energy projects and encourage our coop to investigate as many potential options as possible. For most of us, however, that does not mean blanket approval of any renewable energy project regardless of its social, economic, or environmental consequences. Many questions were raised about possible negative affect to Kenai River and it's wider watershed from several small hydroelectric projects proposed by HEA known as Kenai Hydro. Preliminary studies confirmed significant problems for all except the Grant Lake project. To HEA's credit, efforts to move forward those projects were dropped. Now, however, HEA has decided to press on with Grant Lake. The Alaska Center for the Environment, Kenai Watershed Forum, and Friends of Cooper Landing contend that the Grant Lake project proffers the same problems as the discontinued projects and should also be abandoned. HEAMF was contacted and asked to circulate the information below and attached.

HEA Management has been silent regarding this project recently, ostensibly lacking funds to proceed. The sudden effort to move forward on a fast rack came as a surprise to many stakeholders. While HEAMF has not taken a pro or con position with regard to Grant Lake, it is important that the issues surrounding it receive serious consideration well in advance any decision to develop. As an HEA member, you deserve to have an opportunity to understand and weigh in on these issues.

"Keep the Kenai River Wild"

Homer Electric Association is moving forward with plans to put a dam on Grant Lake, a tributary of the Kenai River. The plans call for 3.5 miles of new roads and transmission lines, a 10 foot by 120 foot long dam, a 110 foot high surgetank, penstock and powerhouse. Grant Lake would be flooded and the water flow in Grant Creek would be interrupted. The cost of construction is estimated at 27 million dollars. Alaska Center for the Environment believes that the costs of losing fish habitat in one of Alaska’s favorite and most productive local watersheds is too high of a price to pay for the insignificant amount of power which will be generated as a result of this project. Grant Creek supports anadromous fish species including Chinook, sockeye and Coho salmon as well as resident species including rainbow trout and Dolly Varden. The Kenai River system supports 34 species of anadromous and resident fish.

What Can You Do?
Please attend the FERC Scoping Meeting and Environmental Site Review. The meeting will take place in Moose Pass on June 2, at 7 PM at the Moose Pass Community Hall. It is the only opportunity to meet with Federal Energy Regulatory Commission officials. Laws require the Commission to independently evaluate the environmental effects of issuing an original license for the Grant Lake Project as proposed, and to consider reasonable alternatives to the applicant’s proposal. FERC is seeking information about the possible impacts this project could have. These could include impacts to water quality and quantity, fish and wildlife resources, cultural, recreational, aesthetic and economic impacts, land use, geologic, soil and other terrestrial resources.

Sign petition opposing the dam by visiting:

www.ipetitions.com/petition/keep_the_kenai_wild/

Submit scoping comments to FERC: (due July 6th, 2010)

*For more information about the process: http://www.kenaihydro.com/documents/GrantLake_Scoping1.pdf

Tuesday, May 18, 2010

HEA Members Forum Update

“Deja vu all over again”
HEA plans to apply to the RCA for another 2% rate increase to take effect in July.

Easy Come, Easy Go
According to discussions at the May 11 Board and Committee meetings, 2009 HEA Board expenses exceeded the $30,000 budgeted by over $20,000. This was attributed in part to having so many new Directors needing training and to travel for lobbying and other utility related functions. President Debnam urged Directors to make flight reservations early in future to help reduce travel costs.

At the same time the Board approved plans to increase Director meeting stipends from $200 to $250 or $300 per day as of January 1, 2011. The separate $200 per day travel stipend was also reconfirmed.

The Truth, the Whole Truth
Among several Board Policy updates approved on May 11 was PB 221 Board of Directors Website Content. Under this policy Directors’ expenses will be published quarterly in the Kilowatt Courier and maintained on the HEA website. Other new items to be added to the website include Directors’ meeting attendance and voting records.

Don’t Ask, Don’t Tell
Board Policy 216, Designated Spokespersons, was approved on May 11 as well. This one directs that “All requests to the Board of Directors for information pertaining to action of the Board shall be directed to the President of the Board.” Does this worry you? Does it mean that your Board representatives are discouraged from communicating with you? Board President Debnam claims not -- “This policy was never intended to impede communication between Directors and HEA Members. I am proud to say that we have an extremely ‘member-focused’ board whose door is always open.”
The General Manager is designated spokesperson for anything related to operations of the cooperative.

Takes the Wind Out of Their Sails
HEA claims it would be too technically difficult to use all 14 + MW Kenai Winds LLC hopes to produce from its proposed Nikiski wind farm. Since wind power is intermittent and unpredictable utilities need to have other power to fill in during calm periods. While the $7 million appropriated by the Legislature was meant to provide money for a fix, HEA feels it still won’t be able to use much more that 4 MW of wind energy in the short term. HEA management and some Directors seem now to be leaning toward using the $7 Million to build our own, smaller wind farm -- assuming the Governor doesn’t veto the appropriation. Bait and switch?

Water Torture?
The Kenai Hydro isn’t dead. While it’s been pared down to one element, Grant Lake, HEA management is still hoping to move ahead with the project, in spite of ongoing opposition from area residents, Kenai watershed protection advocates, and a variety of Alaskan conservation groups. The Federal Energy Regulatory Commission has scheduled rush scoping meetings with comments due by early June. Notice includes a list of issues for consideration and a draft schedule for FERC’s analysis of the license application. The full document is available at www.ferc.gov, and has been posted at: http://www.kenaihydro.com/documents/index.php .

Jobs for Who?
As you probably noticed along ago, HEA has been outsourcing member billing. This change eliminated at least two local jobs but has proven efficient and cost effective. Nonetheless, it has caused a lot of heartburn among HEA members. The Board of Directors keeps getting complaints and now feels your pain. They are looking for ways to bring the work back to Alaska without increasing costs exponentially. No solutions yet, though.

Here Comes the Sun (and other stuff)
Don’t forget -- the Alaska Solar tour comes to the Kenai Peninsula tomorrow, Saturday, May 15. Go to http://www.alaskasolartour.org/ for more information.

Electric Coffee Table
Plan to tune in to next week’s Coffee Table Program on KBBI or KDLL (Wednesday, May 19, 9:00 AM). The focus will be all things HEA with guests Brad Janorschke and Joe Gallagher. This is your chance to ask some hard questions. Call 235-7721 on the southern peninsula, 1-800-979-7405 from elsewhere.

A special HEAMF alert will come your way soon with ideas for questions and comments.

Tuesday, April 20, 2010

Updates

Unlimited Debt
While HEA has a $450 million debt cap, it turns out the Alaska Electric and Energy Cooperative (AEEC), HEA's separate generation and transmission corporation. has none.
All major projects such as Independent Light take place under AEEC.

Being a completely separate legal entity, AEEC is not directly accountable to HEA members -- you have no rights or privileges with respect to it. AEEC meeting agendas are not published on the HEA website and, at least recently, most meetings have been closed to HEA members. You can only influence AEEC indirectly through appeal to HEA Directors. In a recent e-mail exchange, one HEA Director wrote, "I'm aware of the smoke-and-mirrors aspect of that distinction with AE&EC being a one-member co-op, but that is the legal structure. That said, HEA+AE&EC's debts don't and won't exceed HEA's debt cap."

Getting Steamed Up
On April 6th AEEC approved a $5,017,900 design contract for addition of a steam turbine to the Nikiski facility. The contract has been awarded to Stanley Consultants, Inc., an Iowa-based company. This is the first step in implementing the Independent Light project. Most sources seem to agree that retrofitting the Nikiski plant for cogenration makes technical and economic sense. There is room, however, for significant disagreement over plans to follow up with installation of two new single cycle natural gas gererators in Soldotna.

HEA Website Upgrades
At the April 6 meeting, the HEA Operations committee approved our request that HEA Board Policies be posted on the website. They are available at http://www.homerelectric.com/ by clicking Board of Directors and Elections/Board Policies on the left side menu. You will see that bylaws, the district map, a meetings calendar and other Board related information are available there as well.

Unfortunately, so far none of our suggestions for improving the Independent Light Frequently Asked Question page have been acted on and our responses to answers posted there have not been addressed.

HEA Board Perks
You may have read the recent Peninsula Clarion article on HEA Board Reimbursements (April 9 -- $140,000 in director payments in 2009). This is a valid topic for discussion. Throughout the country there have been examples of rural electric cooperative Boards of Directors partaking of unethical and insupportable levels of payment, often amounting to millions of dollars. Is $140,000 excessive? One would need to look closely at how the money was used. HEA Directors are expected to put in an enormous amount of time and asked to travel often on behalf of the cooperative. Most join the Board with limited knowledge of energy issues or the workings of a utility. Professional development workshops and classes help them develop a working understanding to underpin decisions they are asked to make. The $200 per meeting stipend is among the lowest in the state yet the Board recently voted against increasing it. In addition to this stipend, tuition for professional development courses, travel and lodging for HEA business trips and reimbursement of related out of pocket expenses account for part of the money spent on Directors. Can this process be abused? Probably. Perhaps it would be helpful to HEA members concerned about this issue if HEA took steps to clarify how a budget is determined for these activities, how priorities for which events Directors should participate in are set, and what safeguards are in place to guard against abuse.

Net Metering
Although the RCA is still waiting for the State Attorney General to sign of on the Net Metering standards approved in January, HEA is moving to transition from from SNAP to net metering. HEA filed a net metering tariff with the RCA requesting immediate implementation and may be the first railbelt utility to have done so. May 27 is the earliest expected date for RCA approval.

Renewable Energy
An April 6 presentation by Chris Rose of the Renewable Energy Alaska Project (REAP) to the HEA Operatins Committee on Alaska's renewable energy potential was well received. There was specific reference to how HEA and other railbelt utilities can work toward incorporating renewables into their energy mix. HEA Directors showed interest in the potential of Mt. Spurr geothermal and Lake Chakachamna Hydroelectric projects and in tidal generation technology. Unfortunately, there was no discussion of how HEA would integrate the Independent Light project with these sources should they become available. Chris was invited to return and report after taking a first-hand look this spring at a tidal power prototype off the coast of Ireland.

HEA continues to consider how to utilize power from the Fire Island wind farm and Nikiski Kenai Winds projects when they come on line. Because wind power is intermittent it poses problems of load balancing and dispatch that are challenging. Studies of potential sites for small wind projects on the southern peninsula are ongoing. The Grant Lake component of the Kenai Hydro project is still being considered, though it will require additional funding before significant effort can take place.

GRETC on the Ropes
At the April 13 HEA Board meeting the consensus of Directors was that legislation to create a Greater Railbelt Energy & Transmission Corporation (HB 182, SB 143) will not pass the legislature this session. We suspect this is correct. The issue is very complicated, involving a complete reorganization in the way all railbelt utilities and regulators would operate. While both ratepayers and utilities have stated support for the concept of a GRETC, it's become clear that the two interest groups do not agree on some very basic elements and the RCA recently weighed in with it's own questions and reservations. The HEA Board still wants to work with other railbelt utilities and the next legislature on GRETC legislation.

Thursday, April 1, 2010

Ken Hepner's HEA Board Campaign Needs Our Help NOW

It is difficult to unseat an incumbent. Ken is running against HEA Board President Debbie Debnam who supported the Healy 2 coal plant deal and continues to support the questionable Kenai Small Hydro project and lots of Board executive sessions. We are told she is being supported by a powerful group of political insiders including Borough Mayor Dave Carey, Hugh Chumley, and HEA General Manager Brad Janorschke.

HEA Ballots will be mailed tomorrow. Past experience shows that most people mark and return their ballots within to following week or ten days.

Please volunteer to help by placing a Ken Hepner sign on your property (central peninsula folks), or for the phone tree (central AND southern peninsula folks).

Contact Ken or his campaign managers to volunteer.
Ken: hepner(email@)alaska.net or 262-8510
Campaign managers: Dan Chay chay(email@)alaska.com,
Robert Ruffner robert.kwf(email@)gmail.com

Monday, February 15, 2010

HB31 THREATENS NET ENERGY METERING

Testimony will be taken Tuesday, Feb. 16th starting at 3pm at the House Special Committee on Energy hearing on HB 31 .

Louie from Representative Seaton's office thinks they plan to try and put the new RCA regulation language into HB 31. That would make net metering entirely voluntary for the utilities. Under HB 31, cooperatives organized under AS 10.25 are exempt but may waive exemption if the majority of its membership votes in favor of the waiver. Louie thinks this is a backhanded attempt by the utilities to undo net metering regulations passed by the RCA January 15.


Net metering fans will want to testify against this.
The utilities previously testified on the record that Net Metering should be investigated by the RCA and not the legislature. This could be brought up if there are a bunch of utilities testifying on the issue.


If you can attend, please let the LIO know.

Homer Legislative Information Office
345 W Sterling Hwy, Ste 102A
Homer, AK 99603
Phone: 235-7878 Fax: 235-4008

Kenai LIO
145 Main St Lp, Ste 217
Kenai, AK 99611
(907)283-2030/phone (907)283-3075/fax

email: Kenai_Lio(email@)legis.state.ak.us

Tuesday, January 12, 2010

Self Regulation (& more)

Self Regulation
At last night's meeting the HEA Board voted to indefinitely suspend all efforts to pursue deregulation of our coop. While several Board members expressed continuing interest in looking at the option at some point in the future, all agreed this was not the time to do so. During discussion of the motion the Board acknowledged that questions raised by a number of HEA members made them realize they lacked adequate knowledge of the potential costs and benefits of "self regulation." It was also recognized that there are many more pressing priorities confronting the HEA Board and management in the coming months. Clearly, member knowledge of this issue and willingness of some to communicate questions and concerns made a difference.

Continuing HEA Website Upgrades
Also at last night's meeting the Board approved placing voting records of all Board members on the HEA website. This will be done on a "rolling" three-year basis and will include attendance and absence information. Such information can be valuable if you wish to understand the way a given policy developed and where each Board member stands on important issues. Such knowledge will be especially useful to you during Board elections.

Board Meeting Schedule Revised
The Board of Directors has reduced the number of meetings it will hold in Homer from 6 to 4. They will now meet at the Kenai offices 8 months out of the year. The reason given for this change is that they want to accommodate members from all 3 Board districts equally. One wonders how meeting 8 times in Kenai achieves this goal -- no meetings are planned within the Soldotna/Sterling district. We have been told that the Homer meetings will occur during summer months. Unfortunately, specific dates and locations are yet to be listed on the HEA website.

HEA Energy Fair
HEA will hold the second Energy and Conservation Fair in Home at the Islands and Ocean Center on Saturday, November 14, between 10 AM and 4 PM. There will be presentations, workshops, and a chance to visit with various vendors of energy and conservation goods and services. By all accounts, the first fair held last Saturday in Kenai was well attended and many participants considered it a great success.