Friday, August 10, 2012

HEA Members Forum Update

Regular HEA/AEEC Meetings
Tuesday, August 14, 2012

10:00 AM -- Operations and Special Projects
1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting
Location: Meetings take place in the Homer Offices at 3977 Lake Street907-235-8551.  Video conferencing is available in the Kenai Offices at 280 Airport Way.  Draft agendas should available at least a day before meetings on the HEA website athttp://www.homerelectric.com/

BoardofDirectorsElections/
BoardMeetingInformation/Agendas/tabid/220/Default.aspx. There are sometimes last minute changes in scheduling, so check the website.

Tomorrow -- the 8th Annual Alaska Renewable Energy Fair
Saturday, August 11, 2012 -- 11:00 AM-9:00 PM -- Anchorage Parkstrip Between G & I Streets
This a FREE event with live music, food, a beer garden, craft and information booths, kids activities and renewable energy workshops.Go to http://alaskarenewableenergy.

org/events/alaska-renewable-
energy-fair/ for a complete list of activities.

New USDA-Funded Loans for Energy Upgrades
U.S. Agriculture Secretary Tom Vilsack recently announced a $250 million program to allow rural electric cooperative customers to take out USDA-funded loans to make energy upgrades and then pay back the loans through their monthly utility savings.

Like the Alaska Housing Finance Corporation rebate program, a certified energy auditor first evaluates the home and makes recommendations for upgrades. Unlike the AHFC program, qualifying homeowners will get an upfront loan rather than a partial rebate after work is completed.

Two-thirds of the savings resulting from the upgrades would go toward repaying the loan. For example, if the drop in energy use results in a $100 monthly savings, $66 would go toward satisfying the debt, and the homeowner’s bill would still be about $33 less than without the improvements. 

Clean Energy Ambassadors (http://

cleanenergyambassadors.ning.
com/) will host a webinar on August 23 the USDA's Rural Economic Development Energy Efficiency Effort. Register at https://cc.readytalk.com/r/hmxz86da07q1 if you're interested.

City of Homer Sewer Treatment Plant Winner of Great Alaska Energy Challenge
In May 2012 the facility received the Renewable Energy Alaska Project award for biggest reduction in electricity usage, having cut energy use by nearly one sixth, saving enough electricity to power over eight homes in one year!

Thursday, June 28, 2012

Special Alaska Electric & Energy Cooperative Board Meeting

Special Alaska Electric & Energy Cooperative Board Meeting
9:00 AM
Friday, June 29, 2012

Kenai HEA Board Room (
video conferencing from Homer offices)

This special meeting of HEA's generation and transmission arm was called to discuss and vote on approval of a contract for the Soldotna power plant construction, Phase 3 (Combustion Turbine Installation).
 The meeting is expected to last 30-45 minutes with the bulk of it in Executive Session.  

Tuesday, April 24, 2012

Have You Voted That HEA Election Ballot?


If so, give yourself a pat on the back. 

If not, you still have time. 

Mail-in ballots must be received by HEA no later than May 2. 

Elect capable, responsible, Directors to the Homer Electric Association Board.


David Thomas (District 1)    Ed Oberts (District 2)    Jim Levine (District 3)

HEA Members may also vote in person at the Annual Meeting on May 3 at Homer High School.

Tuesday, December 6, 2011

Dec. 7 Wind Power in AK Forum



Fire Island, Kodiak & More
 6-8pm * Anchorage Museum * 625 C Street * FREE




Presenters:
Darron Scott, CEO of Kodiak Electric Association
Suzanne Gibson, CIRI Sr. Energy Development Director
Rich Stromberg, Alaska Energy Authority Wind Program Manager


Thursday, August 18, 2011

HEA Members Forum Update


THERE WILL BE A SPECIAL MEETING OF THE HEA BOARD OF DIRECTORS

THURSDAY, AUGUST 25, 2011  at 10:00 a.m.


Notice is hereby given that a Special Meeting of the Board of Directors of Homer Electric Association, Inc., pursuant to Article V, Sections 2, 3, and 6 of the Homer Electric bylaws, will be held at 10:00 a.m. on Thursday, August 25, 2011 at 280 Airport Way, Kenai, Alaska. The purpose of the meeting is to consider authorizing the General Manager to proceed in the application process to seek grant funding for the Kenai Hydro, LLC Hydroelectric Dam Project.

Video conferencing will be available in the Homer Offices at 3977 Lake Street, 907-235-8551.
Information and perspective on this project is available on these websites:


http://www.kenaihydro.com/index.php

http://akcenter.org/forests-and-wildlife/chugach/kenai-hydro

Monday, July 11, 2011

Regular July HEA/AEEC Meetings

Meetings take place this week at the Homer Offices, 3977 Lake Street. Video conferencing is available in the Kenai Offices at 280 Airport Way, 907-283-5831.

Tuesday, July 12, 2011

10:00 AM -- Operations and Special Projects
1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting
Draft agendas are available on the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx
. There are sometimes last minute changes in scheduling.

Excerpts from the June HEA Manager's Report

Regulatory Commission of Alaska (RCA) Docket regarding the HEA/AEEC relationship – The RCA docket that questions the relationship between HEA and AEEC is still open. The deadline of May 27 was extended until June 27, 2011. It appears that questions posed by the petitioners are related to governance and legal matters. [This matter is the subject of a formal compliant filed by seven HEA members concerned about possible inappropriate management practices.]

Renewables
Tidal Power – HEA staff met with ORPC [Ocean Renewable Power Company] representatives on June 1 to discuss
how to continue to develop a tidal power pilot project in Cook Inlet. The discussion went well as the parties look to conduct research, develop project plans, indentify grid interconnection, update project costs, and establish a legislative strategy prior to the end of this year.

Watana [proposed Susitna Dam] – Alaska Energy Authority and their engineering contractor met with some of the Railbelt engineers June 8 to discuss the proposed project. Most of the discussion centered on establishing the appropriate size of project for the Railbelt. The 600 MW size identified in the Railbelt Integrated Resource Plan appears to be acceptable amongst the utilities.

Fire Island – Based on a June 10 press release, Chugach Electric Association (CEA) and Cook Inlet region, Inc. (CIRI) have come to terms on wind energy output from the Fire Island Project. CEA has agreed to pay CIRI a net cost of $97.00 per MWh for 25 years beginning December 31, 2012. The proposed power purchase agreement will require Regulatory Commission of Alaska (RCA) approval.

Bernice Lake Generation –Chugach Electric Association’s (CEA) board of directors has approved the sale of the Bernice Lake Generation Facility located in Nikiski to AEEC. At this time negotiation of final documents is substantially complete, but the documents have not been executed. Although HEA/AEEC and CEA have agreed to the sale, the final sales transaction is contingent on several things including approval from the Regulatory Commission of Alaska (RCA). Assuming the asset sale takes place, the roughly 67 MW facility will be used to supplement the peaking and backup generation planned for Soldotna. The Bernice Lake generation does not replace the current LM6000 [single cycle gas turbine generator] scheduled for the Soldotna site. [Hopefully this will eliminate future purchase of a second turbine for Soldotna, however.]

HEAMF clarification notes and comment were added in [brackets]. HEA Manager's reports can be downloaded from the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/ManagersReports/tabid/222/Default.aspx

Monday, May 2, 2011

Election and Meeting Reminder

A Final Reminder!

2011 Annual HEA Meeting of the Members

Thursday, May 5 at 
Soldotna High School
Registration 4:30 PM - 6:30 PM, Membership Meeting Starts 6:00 PM
Don't Forget to Vote
District 1: incumbent David Thomas of Kenai
District 2: Dick Waisanen of Soldotna
District 3: Malcolm Gaylord of Homer
HEA must receive mail-in ballots by 4:00 PM, May 4. Members can also vote at the Annual Meeting but need to register there first. 

Where is Soldotna High?
425 W. Marydale Ave. Soldotna, AK 99669
907-262-7411 

Check out the Google map:
http://high-schools.com/schools/8791/soldotna-high-school.html

Turn west on Maydale Dr. from N. Binkley St. or the Kenai Spur Highway. Continue west to Sohi Ln. and you should be able to see the school. If you come to Ridgewood Dr. or River Watch Dr. you've gone to far.

Tuesday, April 19, 2011

HEA Members Forum Update

2011 Annual HEA Meeting of the Members
Thursday, May 5 at
Soldotna High School
Registration 4:30 PM - 6:30 PM, Membership Meeting Starts 6:00 PM

Other May HEA/AEEC Meetings will take place at the 
Homer Offices, 3977 Lake Street.
Video conferencing is available in the Kenai Offices at 280 Airport Way.

Tuesday, May 10, 2011

10:00 AM -- Operations and Special Projects
1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Agendas are usually available the day before meetings. There are sometimes last minute changes in the meeting schedule. Check for updates and draft agendas on the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx.

2011 HEA Board Elections -- Don't Forget to Vote

District 1: incumbent David Thomas of Kenai
District 2: Dick Waisanen of Soldotna
District 3: Malcolm Gaylord of Homer

HEA must receive mail-in ballots by 4:00 PM, May 4. Members may vote in person at the May 5 Annual Meeting at the Soldotna High School but will need to register there. You can only vote for a candidate in the district where you live.

Rate Decoupling and Energy Efficiency and Conservation Programs Technical Conference
April 19 &20, 9:00 a.m. to 4:00 p.m.
East Hearing Room of the Regulatory Commission of Alaska
701 West Eighth Avenue, Suite 300, Anchorage, Alaska 99501

This technical conference will feature a presentation on the topics of rate decoupling and energy efficiency and conservation programs by Richard Sedano, a Principal and Director of The Regulatory Assistance Project. The presentation on rate decoupling is tentatively scheduled for Tuesday, April 19th, with the presentation on energy efficiency and conservation programs to follow on Wednesday, April 20th. Any entity interested in reviewing transcripts of this technical conference may consult the Commission’s website at http://rca.alaska.gov and type in Docket “I-11-004” in the Find a Matter search box.

Don't Forget the 2011 Business of Clean Energy in Alaska Conference
April 28 & 29
at the Dena'ina Center in Anchorage
For more information, go to www.BCEAconference.com, or contact Renewable Energy Alaska Project (REAP) at info@realaska.org or 907-929-7770.

Regulatory Commission of Alaska Adopts Revised Net Metering Interconnection Rules
Draft rules from January 2011 (RCA Docket R-09-02) were slightly modified to resolve potential conflicts between utility and customer over an "external disconnect switch." In general, these regulations appear to be reasonable and should not impose unnecessary expense to HEA members who wish to participate in net metering. The regulations go to the Department of Law for review but should be finalized without major change by May 5, 2011.

Regulatory Commission of Alaska Reauthorized -- But Only for 2 Years
The Alaska Senate passed HB 24 on April 17, 2011 by unanimous vote, extending the RCA through June 2013. The Senate modified language in HB 24 to require the RCA to provide the Legislature with a proposal to "reduce the statutory timeline for tariff filings that change a utility's revenue requirement or rate design." This must be done by January 17, 2012. Clearly this is a result of utility lobbying to make it easier and faster to increase your rates.

Independent Light $$
A Groundbreaking Ceremony is slated for
the Nikiski Combined Cycle Conversion (NCCC) Project April 28, 2011, at 10:00 a.m. At the ceremony, HEA will announce the award of the project contractor and will offer Nikiski Plant tours for anyone interested. If you are interested in attending but don't receive an invitation, contact Joe Gallagher at jgallagher@homerelectric.com.

Cook Inlet Tidal Power
Ocean Renewable Power Company (ORPC) and Homer Electric Association (HEA) announced plans to collaborate on a hydrokinetic power pilot project near the East Forelands. ORPC has been developing unique tidal power systems and projects since 2004. ORPC has a preliminary permit from the Federal Energy Regulatory Commission (FERC) that allows three years to carry out studies and then submit a license application for an actual pilot project of up to 5 megawatts (HEA’s average load is currently 60 megawatts). It's possible that one or more 150-kilowatt generators could be deployed for testing in the inlet as early as 2013. HEA and ORPC are attempting to draft a Letter of Intent which defines the project scope and responsibilities.

HEA Rate Plan
The RCA has granted Land’s End Acquisition Corporation (LEAC) request to intervene in hearings on HEA's plan to restructure electric rates. Remember, the biggest sticking point is the proposed "minimum energy charge" which seems to be in conflict with Alaska Administrative Code. The RCA requested that previous hearing dates be changed to accommodate the Commission’s schedule. Intervening parties, the Attorney General’s Office (RAPA), and HEA have presented a mutually agreed upon revised hearing schedule for RCA consideration. The proposed final hearing would be during the week of September 26th. HEA is waiting for RAPA to reply to its legal brief on the proposed minimum energy charge.

"Watt’s New" -- From HEA
This is a new email public relations effort to deliver up-to-date news to members. It will encourage members to visit the HEA website where more detailed information can be found. The first “Watt’s New” blitz was sent to 7,900 members on April 1 and will be disseminated at least once a month -- more frequently depending on HEA events. It seems like a good idea. Contact Sandra at sghromley@homerelectric.com or 907-283-5831 if you're interested in signing on.

Monday, January 24, 2011

HEA Members Forum Update



February HEA/AEEC Meetings
These meetings will take place in Kenai at the Central Peninsula Offices, 280 Airport Way. Video conferencing is available in the Homer Offices at 3977 Lake Street.

Tuesday, February 1, 2011 (tentative)            

2:00 PM -- Operations and Special Projects
Tuesday, February 8, 2011 

1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Check for meeting calendar updates and draft agendas on the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx.

2011 HEA Board Elections
The HEA Board election season is coming. The application period for candidates usually starts in February and runs through the first week in March (the 5th, last year). Ballots go out to members about a week after that and can be returned through early May. This year David Thomas (District 1), Tim Evans (District 2), and Mike Wiley (District 3) must run if they want to stay on the HEA Board. In preparation HEA Resolutions 45.2011.02 (Appointment of Election Committee) and 45.2011.03 (Voting Eligibility Record Date) were passed at the January 18 HEA/AEEC meetings. There was some discussion of the the need to prepare ballot Initiatives for HEA members to vote on. Apparently certain bylaws changes sought by the Board must be approved by the general HEA membership. further discussion was moved to the February meetings -- more detail on this will follow then.

Now is the time for you to be thinking about how satisfied you are with your district’s HEA Director. Would you like to see him continue on the Board for another 3 year term or would you prefer to elect someone new? Maybe you would even like to run yourself.

HEA/AEEC Proposed Rate Plan -- HEA reply
Since the RCA suspended the HEA/AEEC request for approval of the plan (Order U-10-97, Order No. 1), the cooperative has submitted a 19 page brief in defense of the minimum energy charge. In part it argues that if, as stated by the RCA suspension order, the minimum energy charge is in conflict with Alaska Administrative Code 3 AAC 48.805 the RCA should waive requirements that the new rate plan comply. If you want more detail, this and related documents are available on the RCA website at http://rca.alaska.gov/RCAWeb/Entity/EntityDetails.aspx?id=883fd287-5437-45c3-ac93-6611db2d87b0.

Independent Light $$
There have been no significant developments since our January 6 HEAMF update. Alaska Energy & Electric Cooperative Resolution 01.2011.01 (Approval of Construction Work Plan) was passed at the January 18 HEA/AEEC meetings. Most of the plan's $200 million expense is for the Independent Light project ($180 million). The remaining $10 million is primarily for work on Sterling and Bernice Lake substations. AEEC Resolutions 01.2011.02 and 01.2011.03 amending HEA/AEEC loans and agreements with the National Rural Utilities Cooperative were passed. These are technical changes needed to accommodate a drop in “margins” expected during construction of Independent Light facilities (margin is the difference between an electric  cooperative’s costs and revenues).
  
New Regional Generation and Transmission Coop
HEA/AEEC joined Chugach Electric Association, Matanuska Electric Association, Golden Valley Electric Association, and the City of Seward to form the Alaska Railbelt Cooperative Transmission and Energy Cooperative (ARCTEC). Anchorage Municipal Light and Power declined to participate. The Members Forum has long supported greater cooperation between railbelt utilities. Articles of incorporation were filed with the Division of Corporations, business and Professional Licensing (http://www.commerce.state.ak.us/occ/) on December 23, 2010. ARCTEC is an outgrowth of the Greater Railbelt Energy and Transmission Corporation (GRETC) legislation which failed last year. The objective is to have a mechanism to cooperatively pursue projects that are just too large and costly for a single utility. According to HEA manager Brad Janorschke, there will be a strong emphasis on developing large scale renewable energy sources such as geothermal, hydroelectric, and tidal projects. ARCTEC bylaws are presently being developed. HEA Resolution 45.2011.01 (Appointment of ARCTEC Representatives -- Debbie Debnam and Brad Janorschke) was passed at the January 18 HEA/AEEC meetings.

Grant Lake Small Hydro Project
According to General Manager Janorschke the Alaska Energy Authority has approved $1.1 million of a $1.5 million HEA/AEEC grant request for the Grant lake project. He cautioned the Board that this must also be approved by the Legislature, so it’s not a “done deal” yet. This money would help offset ongoing field studies and permit application efforts. The project continues to be very controversial among Moose Pass residents and some HEA members.

Cook Inlet Tidal Power Pilot Project
According to HEA General Manager Brad Janorschke, a hydrokinetic energy company contacted HEA about possible partnership in some kind of pilot project. This could be some place near the Forelands. The company also appears interested in tidal prospects around Kachemak Bay. Janorschke says he was told they would be in touch again soon with some kind of specific plan.  

AKPIRG Utility Work
The Alaska Public Interest Research Group (AKPIRG) is taking an interest in utility consumer affairs and has recently hired a young woman named Kathleen Cogan to work with railbelt ratepayers. A main main part of her work will involve helping utility ratepayers from Golden Valley Electric Association to Homer Electric Association elect or reelect good people to the utility Boards. Kathleen works out of the Anchorage AKPIRG office but will travel to other railbelt communities on a regular basis. She will visit Homer this week where she can be reached at the Cook Inetkeeper offices.

Better Record Keeping ?
At the January 18 HEA/AEEC meetings Mike Wiley continued to press for more detailed meeting minutes. David Thomas expressed concern that putting too much detail into the minutes could be counterproductive. He especially doesn’t think various Directors’ comments prior to voting on resolutions should be included. While many Directors express resistance to putting specifics in the minutes, Jim Levine agreed with Mike Wiley and moved that, at the very least, topics of comments made by HEA members attending meetings should be noted in minutes. The motion was passed.

Fewer Secrets, At Least
HEA resolution 45.2011.04 (Approval of the 2011 Equity Management Plan) was approved at the January 18 HEA/AEEC meetings. HEA/AEEC filed a petition with the Regulatory Commission of Alaska in November to classify it’s 2010 Equity Management Plan confidential. In December the RCA denied that petition (U-10-85, Order No. 2). According to General Manager Janorschke the Commission will now probably require a copy of the EMP be provided for interested members of the public with only legitimately sensitive information redacted. Hopefully this will also apply to the 2011 EMP. 

Thursday, January 13, 2011

HEA Members Forum Update

January HEA/AEEC Meetings
These meetings will take place in Kenai at the Central Peninsula Offices, 280 Airport Way. Video conferencing is available in the Homer Offices at 3977 Lake Street.

Tuesday, January 18, 2011 (tentative)
10:00 AM -- Operations and Special Projects

1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Check for meeting calendar updates and draft agendas on the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx.

No More Secrets for Now
Last November HEA/AEEC filed a petition with the Regulatory Commission of Alaska to classify it’s 2010 Equity Management Plan as confidential. This would keep a lot of information about how the coop conducts business out of the hands of HEA members -- or anyone else for that matter. Several HEA members followed up with a request for a stay pending resolution of a previously filed informal complaint. On December 17, 2010 the RCA denied the HEA/AEEC petition for confidentiality (U-10-85, Order No. 2). The coop may reapply if willing to supply meaningful justification for such blanket confidentiality.

HEA/AEEC Rate Plan on Hold
The proposed new rate design was filed with the RCA on November 9, 2010. Under the plan, the present $11.00 monthly residential customer charge would increase to $15.00 and a minimum monthly 150 kWh energy charge would be added. After receiving 22 public comments, all but one opposing the plan, the RCA suspended the HEA/AEEC request for approval (Order U-10-97, Order No. 1). The December 17, 2010 stay requires HEA/AEEC to submit a brief addressing how the proposed “minimum energy charge” complies with relevant Alaska Administrative Code. It also schedules further investigation, invites petitions to intervene from interested parties and participation by the Attorney General, and appoints an administrative law judge to conduct the docket. The deadline for petitions to intervene is 4 p.m., January 18, 2011. A prehearing scheduling conference for the matter will be held in the Commission’s East Hearing Room at 9 a.m. on February 4, 2011. Go to the RCA website at http://rca.alaska.gov/RCAWeb/Entity/EntityDetails.aspx?id=883fd287-5437-45c3-ac93-6611db2d87b0 for documents relating to HEA/AEEC.

WPCRA vs. COPA -- Say What?
Given the RCA stay of HEA/AEEC’s proposed rate plan this might be moot but here goes anyway. One of the complaints against the rate plan was a move to replace the Wholesale Power Cost Rate Adjustment (WPCRA) with a Cost of Power Adjustment (COPA). Remember, the WPCRA is that fluctuating cost HEA has to pay for energy, mostly reflecting the price of natural gas. It’s passed through to you. According to a December 6, 2010 letter from RCA staff, unlike the WPCRA, the COPA would allow HEA/AEEC to change rates associated with fuel and purchased power absent the normal RCA rate proceeding. It looks like going to the COPA would result in an instant rate increase as well. When the new rate plan was presented to HEA members the WPCRA was less than one cent (.00715) per kWh. The figure given for the COPA under the new plan was 2.862 cents per kWh -- much higher. What extra things does it include? While this information has been requested many times, there has as yet been no side-by-side comparison of these two computations. HEA’s Joe Gallagher is trying to get this for us but has so far been unable to deliver.

Independent Light $$
Phase One of the Independent Light project, upgrade of the Nikiski plant, is proceeding as planned according to the December 14, 2010 update from the HEA/AEEC engineering staff. At that time design work was 90 percent complete and construction bids were expected to go out last month. A contract should be awarded in February 2011, work should be completed by 2012, and the new steam turbine should be in commercial operation by the 4th quarter of that year. This upgrade is expected to improve efficiency of the plant by 40 percent without burning any extra fuel, allowing it to generate most of the baseload requirements for the HEA/AEEC service area.

Phase Two of the project, addition of new gas generation facilities at Soldotna to supply “peaking” and reserve energy, is moving forward as well. Additional property has been purchased at the old “Soldotna 1” site, Stanley Consultants was awarded a contract for up to $3,300,000 for facility design, and purchase of one gas turbine generator for approximately $22,700,000 was authorized. HEA/AEEC Directors declined to authorize purchase of two units as originally envisioned by management. Discussion of the enabling resolution (10-34) indicated that some Directors have misgivings about investing so much money in new natural gas hardware and would like to investigate other renewable energy sources. This decision will be revisited in the near future.

Cook Inlet Natural Gas Storage Alaska (CINGSA)
With diminishing Cook Inlet natural gas supplies, keeping the heat and lights on during winter cold snaps is becoming iffy. This is a growing concern for HEA/AEEC, especially with at least one new gas turbine slated for Soldotna. As a partial solution, CINGSA proposes an underground storage facility in Kenai to hold natural gas during times of low demand and then withdraw the gas during peak demand (winter). At the December 14, 2010 HEA/AEEC meetings AEEC Resolution 10-31 was approved authorizing HEA General Manager Janorschke to sign a contract committing HEA/AEEC as a customer of the CINGSA project. Other CINGSA customers include Enstar, Municipal Light and Power of Anchorage, and Chugach Electric Association. If the project is successfully developed HEA/AEEC commits to a 20-year contract. The coop would pay monthly fees for its share of storage capacity and the amounts of gas it injects or withdraws. It will also need to supply (purchase) gas and pay for the energy used to inject or withdraw it. There will be added charges if amounts of gas stored, injected, and withdrawn exceed that allowed by the contract. While speculative, estimates of cost to HEA/AEEC range between $900,000 and $1,988,000 per year.


AEEC Board Meeting Minutes and Voting Record
A small concession was won at the December 14, 2010 HEA/AEEC meetings. In response to a HEAMF request, Directors approved a motion to start posting Alaska Electric and Energy Cooperative Board meeting minutes on the HEA website as is already done for HEA Board meetings. This is important because the minutes contain a record of how Directors vote on various resolutions. It’s one way for HEA members to evaluate Director performance and make good decisions at annual Board elections. But more needs to be done.

Since inception in 2002 the AEEC has been more or less invisible to HEA members. There is little information provided on the HEA website -- only meeting notices and agendas. Considering that the present conversion from a distribution utility to a generation &transmission utility is likely the largest, most costly event in our coop’s history and is being accomplished primarily through the AEEC, this seems like a significant omission. For some time we have requested that HEA fully disclose and explain to members the HEA/AEEC relationship. This should include posting of AEEC organizational documents such as bylaws, Board policies, Board member information, and other pertinent materials on the HEA website -- or on a new AEEC site. HEA members are not also AEEC members. AEEC has no debt limit. Consequently, it should be made clear how HEA members can have a voice in AEEC affairs, what measures are in place to prevent unlimited borrowing through the AEEC, and what checks and balances preclude bad decisions by those who conduct AEEC business.

Tuesday, November 23, 2010

HEA Members Forum Update

Last Chance to Comment on the New HEA Rate Plan
The new HEA rate plan was filed with the Regulatory Commission of Alaska on November 2, 2010. It is undergoing a 45-day review by RCA staff. At the end if this period (around December 17) staff will present recommendations to Commissioners and a docket will be open for further investigation. This will likely include a 20-day public review process. Watch for notice of this if you have concerns or suggestions about the proposed rate plan that you would like to bring before the RCA.

Weigh in on New Energy Efficiency Standards
The RCA is considering adoption of new amendments to the Public Utilities Regulatory Policies Act which are intended to encourage energy efficiency, among other things. As might be expected, the RCA staff suggests against adopting the federal standards but does propose some modest increase in state regulatory support for energy efficiency. You have until December 9 to submit comments. See the attached summary for more information and go to the source at http://rca.alaska.gov/RCAWeb/Dockets/DocketDetails.aspx?id=ccbcfb40-5010-41c7-af3d-d2e42b57241d.




Independent Light -- Not the Brightest Bulb
Through it’s shadow corporation, the Alaska Electric and Energy Cooperative, Inc., HEA approved spending another $4.5 million on equipment and design engineering services for the Nikiski facility and old Soldotna 1 site. Most of this, $3.3 million, went to the latter. For the most part people see the logic in spending money to improve efficiency of the Nikiski plant. But to many, in a situation where the natural gas supply is questionable, spending millions on new stand-by gas turbines for Soldotna seems like a bad choice. All the more so, given that Anchorage Municipal Light & Power offered a power purchase agreement that one HEA Board member reputedly deemed “a pretty good deal.” As one former HEA electrical engineer recently pointed out, it’s unlikely we can ever recover the cost of new Soldotna turbines. With no one but ourselves to sell power to, they will stand idle most of the time and never generate revenue.

Alaska Railbelt Cooperative Transmission and Energy Company (ARCTEC)
HEA and other railbelt utilities continue to work on draft articles of incorporation for this potential confederation aimed at improved collaboration. The stated intent is to improve prospects for dealing with natural gas supply problems, better address transmission issues, and pursue utility scale alternative energy opportunities. According to HEA General Manager Brad Janorschke, utilities hope to come to agreement and file the articles by the end of this month (November). We agree that better collaboration will be needed to effectively meet railbelt energy needs in the coming years. Such efforts are to be commended, assuming that ratepayer interests are being taken into consideration. Unfortunately, as is so often the case, this process is being conducted behind closed doors.

Renewable Double Speak
While all of the HEA Directors say they favor adding more renewable energy sources to our energy mix, General Manager Janorschke has joined with other railbelt utility managers in signing the attached letter to the RCA and legislative leaders complaining that integrating renewable energy into the existing generation scheme is just too difficult. While the letter claims it isn’t a rejection of renewable technologies, it sure comes out reading like one. These utilities have failed to work with each other or potential independent power producers like Fire Island Wind (CIRI) or Kenai Winds to find ways to overcome integration challenges. HEA has committed to spending $180 million (plus) on natural gas generation but only $2-3 million on a single, very controversial, small hydroelectric project and not a dime on technology to balance fluctuations from wind generators. Railbelt utilities predict potentially high costs associated with integrating renewable energy but think nothing of increasing our dependency natural gas, even if we need to import it in liquefied form from outside. Wonder what that’s going to cost?




December HEA/AEEC Meetings
These meetings will all take place in Kenai at the Central Peninsula Offices, 280 Airport Way.

Tuesday, December 7, 2010
2:00 PM -- Operations and Special Projects

Tuesday, December 14, 2010
1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Download draft agendas at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx. Video conferencing is available in the Homer Offices at 3977 Lake Street -- call either HEA office at 283-5831 (Kenai) or 235-8551 (Homer).

Monday, September 13, 2010

This Week's HEA/AEEC Meetings


These meetings will take place in Kenai at the Central Peninsula Offices, 280 Airport Way.

Tuesday, September 14, 2010
9:00 AM -- Operations and Special Projects
1:00 PM -- Finance Committee
3:30 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Download draft agendas at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx.
Video conferencing is available in the Homer Offices at 3977 Lake Street.

Next Week's Area Meetings
The proposed new rate structure will be the main focus of the General Manager's presentation.

Anchor Point, 5:30 PM, Monday September 27, Chapman School
Kasilof, 5:30 PM, Tuesday September 28, Tustumena School
Sterling, 5:30 PM, Wednesday September 29, Senior Center
Nikisiki, 5:30 PM, Thursday September 30, Community Center

These meetings are typically a venue for HEA management to express it's point of view in a controlled situation, absent divergent outlooks. Free food and the promise of drawing prizes seem to be uppermost in attending HEA members' minds. Nonetheless, it is an opportunity for you to raise questions and express your own opinions regarding any HEA issue.

Thursday, August 12, 2010

August HEA Meeting Schedule

All meetings will take place in the Board room of the HEA offices in Homer at 3977 Lake Street. Video conferencing is available at the HEA offices in Kenai at 280 Airport Way. Meeting agendas can be found on the HEA website at http://www.homerelectric.com/. Contact Joe Gallagher at jgallagher (email at) homerelectric.com or 907-283-2324 for more information.

Tuesday, August 17, 2010
10:00 AM -- HEA Operations Committee Meeting
12:30 PM -- HEA Finacne Committee Meeting
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Wednesday, August 18, 2010
9:00 AM Final Ratemaking Presentation by Consulting Firm RW Beck

Saturday, June 12, 2010

HEA Members Forum Update

Rate Creep
On July 1 rates go up .154 of a cent per kWh. According to HEA that's about 97 cents a month for the "average" member. That's better than the 2 percent increase we were expecting -- stay tuned for that one.

Secret Rate Redesign Process
The HEA Board and management have started the process of redesigning how your electric rates are computed. This summer HEA Directors will have "how to" workshops and background documents on the subject. Unfortunately HEAMF requests to participate in the learning process were turned down. In e-mail and telephone contacts with several HEA Directors we urged that the wider membership be informed of this process and provided an overview of what it’s about and how it will unfold. So far management and most Directors don't seem to want ordinary HEA members involved. One thing under review for sure will be the "customer charge." That's the monthly fee all HEA members pay for just being connected to the system. Management has already advised Directors that the present charge is way too low and needs to be increased.

Alternative Energy Smackdown
In his wisdom Governor Parnell vetoed money the Legislature allocated for community natural gas and alternative energy projects for our state. Among these was the $7 million grant for HEA to utilize wind power from the 14.4 MW Kenai Winds project being pursued by APEX energy. Unfortunately for us, at the June 1 special Board meeting HEA General Manager Brad Janorschke told Directors we should give up altogether on trying to integrate wind energy without the $7 million.

Small Hydro Pumpup
On June 1 a special meeting of the HEA Board was sandwiched between the Alaska Electric & Energy Cooperative(AEEC) and HEA Operations Committee meetings to consider Resolution 10-25, allocation of $2 million from the HEA budget for site studies and completion of the Federal Energy Regulatory Commission (FERC) construction permit application process. After a presentation by HEA engineering staff and several minutes of Board discussion the resolution was approved. This came out of the blue with little or no advance notice -- HEA members and organizations with strong interest in the project such as the Kenai Watershed Forum were not made aware of the resolution. If approved, construction cost is estimated at $30 million and the project would produce about 4.5 MW of electricity. Questions remain regarding potential negative impacts to fish and habitat.

Next Week’s HEA Meetings
Tuesday June 15, 2010, Homer HEA Offices (video conferencing available from the Kenai offices).

Closed Board Workshop 12 Noon
Finance Committee Meeting 3:00 PM
Full Board Meeting 5:30 PM

Agendas have not been posted on the HEA website at this writing. Go to the following pages within the next several days to look for meeting and agenda information.
http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx
http://www.homerelectric.com/BoardofDirectorsElections/MeetingCalendar/tabid/240/Default.aspx

Tuesday, May 18, 2010

HEAMF Call in Reminder

DON'T FORGET!!! CALL THE COFFEE TABLE PROGRAM
KBBI/KDLL this Wednesday, May 19 at 9:00 AM


The focus will be all things HEA with guests HEA General Manager Brad Janorschke and Public Relations Coordinator Joe Gallagher.

Call 235-7721 on the southern peninsula, 1-800-979-7405 from elsewhere.

ASK QUESTIONS
TELL THEM WHAT YOU WANT AS AN HEA MEMBER


1. ANTI-COOPERATIVE PRACTICES
Why were HEA members excluded from the planning of the Independent Light project?

Shouldn’t the HEA membership be given a chance to approve, modify, or reject this historic change?

Shouldn’t HEA members have more opportunities for planning and approving or rejecting other proposed projects such as small hydroelectric and wind?

Was the Alaska Electric and Energy Cooperative (AEEC) formed with approval of the HEA membership or simply by the HEA Board and staff?


2. ALASKA ELECTRIC & ENERGY COOPERATIVE (AEEC)
Is it true that HEA members are not also AEEC members? Who is an AEEC member?

Who runs AEEC?

Who is AEEC responsible to?

Does the HEA Tariff also apply to AEEC or does it have it’s own?

3. LEVEL OF DEBT
Is it true that the combined HEA/AEEC debt is or soon will be at $339 million.

Is it true that AEEC is not bound by the $450 million HEA debt cap and has no such limit of its own?

Will $180 million cover all elements of the Independent Light project or will additional debt be required? If more, how much?

How will payment toward interest and debt retirement affect electric rates?

4. INDEPENDENT LIGHT AND OTHER PROJECTS
HEA management asserts that “studies indicate that the cost for HEA to own and operate the new assets will be about the same (perhaps slightly lower) as paying another utility for wholesale power.” Where can HEA members review these studies?

Even though the decision was made without their input, most HEA members seem to support upgrading the Nikiski plant. However, many question the wisdom of buying new gas turbines for Soldotna as the best way to meet peaking, reserve, and contingency demand. Would you be willing to bring the wider HEA membership into the decision process now?

If we invest hundreds of millions in Nikiski AND new gas turbines to meet ALL base load, peak, and emergency demands how will we afford to buy significant amounts of renewable energy as new projects come on line?

The Legislature appropriated $7 million to fund a 5 MW reciprocating generator or a battery bank to allow HEA to integrate the 14.4 MW of power from the Kenai Winds project into the existing grid. Why won’t that solve the problem of “following” this intermittent source of energy?

HEAMF Action Alert

CALL THE COFFEE TABLE PROGRAM
KBBI/KDLL this Wednesday, May 19 at 9:00 AM

The focus will be all things HEA with guests HEA General Manager Brad Janorschke and Public Relations Coordinator Joe Gallagher.

Call 235-7721 on the southern peninsula, 1-800-979-7405 from elsewhere.

ASK QUESTIONS
GIVE YOUR PERSPECTIVE AS AN HEA MEMBER


While there are many issues affecting rates, quality of service, and other HEA member interests, four are particularly obvious right now:

1. ANTI-COOPERATIVE PRACTICES
2. ALASKA ELECTRIC & ENERGY COOPERATIVE (AEEC)
3. LEVEL OF DEBT
4. INDEPENDENT LIGHT AND OTHER PROJECTS


Want ideas for questions?
Look below (in italics) under each of the four topics, along with a little background information on each.

--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

ANTI-COOPERATIVE PRACTICES
Questions:

Why were HEA members excluded from the planning of the Independent Light project?

Shouldn’t the HEA membership be given a chance to approve, modify, or reject this historic change?

Shouldn’t HEA members have more opportunities for planning and approving or rejecting other proposed projects such as small hydroelectric and wind?

Was the Alaska Electric and Energy Cooperative (AEEC) formed with approval of the HEA membership or simply by the HEA Board and staff?


Background:
The Seven Guiding Cooperative Principles All rural electric cooperatives, including HEA, are supposed to adhere to these principles. Two are of particular interest here:

“Cooperatives are democratic organizations controlled by their members, who actively participate in setting policies and making decisions. The elected representatives are accountable to the membership.”

“While focusing on member needs, cooperatives work for the sustainable development of their communities through policies accepted by their members.”

With Independent Light HEA has embarked upon the largest, most costly change in its history -- transformation from a simple distribution cooperative to a generation and transmission utility. HEA members remain out of the loop.

The development of and decision to move forward with Independent Light was made exclusively by the HEA management and Board of Directors. The General Manager was authorized to do so on June 24, 2008. A July 9, 2008 press release sketched a general plan. Members were provided little other information until a January 12, 2010 press release describing the complete plan. You were not invited to review and comment on the plan at any point. There was never a vote by the membership to accept Independent Light. This was true for its predecessor, the Healy coal plant plan, and is true for present small hydro and wind proposals.

All generation and transmission projects now take place under the Alaska Electric and Energy Cooperative (AEEC). It is unclear whether or not the general HEA membership voted to approve its formation in 2001.

ALASKA ELECTRIC & ENERGY COOPERATIVE (AEEC)
Questions:
Is it true that HEA members are not also AEEC members? Who is an AEEC member?

Who runs AEEC?

Who is AEEC responsible to?

Does the HEA Tariff also apply to AEEC or does it have it’s own?


Background:
There are many unknowns regarding AEEC. One thing IS clear -- HEA members have no standing. According to HEA staff and Directors, AEEC was formed in 2001 to allow funds to be borrowed at a lower rate of interest. It is a separate generation and transmission cooperative and HEA is the only member. AEEC bylaws do not indicate a limit on how much money it can borrow or spend. In recent months it has authorized borrowing $205 million. AEEC passes all expenses on to it’s one member/customer, HEA. HEA then charges us through our electric rates. Even though the two cooperatives are legally separate entities, HEA Directors also serve as AEEC Directors and HEA staff is tasked with AEEC work. All Alaska utilities operate under a set of rules outlined in a “Tariff “ filed with the Regulatory Commission of Alaska (RCA). It is unclear whether or not AEEC is also covered by the HEA Tariff.

LEVEL OF DEBT
Questions:
Is it true that the combined HEA/AEEC debt is or soon will be at $339 million.

Is it true that AEEC is not bound by the $450 million HEA debt cap and has no such limit of its own?

Will $180 million cover all elements of the Independent Light project or will additional debt be required? If more, how much?

How will payment toward interest and debt retirement affect electric rates?


Background:
According to HEA General Manager Brad Janorschke, the 2009 year end financial audit showed the debt to be $121 million HEA and $38 million for AEEC. In a May 3, 2010 e-mail he stated that when combined with all recently authorized new loans it would bring the total debt burden to $339 million. Bear in mind that only the $121 million in HEA debt counts against the $450 million debt cap. In HEA/AEEC meetings last year, HEA Director of Finance stated that present loans carried a fluctuating interest rate which was at about 4.75 percent at the time.

INDEPENDENT LIGHT AND OTHER PROJECTS
Questions:
HEA management asserts that “studies indicate that the cost for HEA to own and operate the new assets will be about the same (perhaps slightly lower) as paying another utility for wholesale power.” Where can HEA members review these studies?

Even though the decision was made without their input, most HEA members seem to support upgrading the Nikiski plant. However, many question the wisdom of buying new gas turbines for Soldotna as the best way to meet peaking, reserve, and contingency demand. Would you be willing to bring the wider HEA membership into the decision process now?

If we invest hundreds of millions in Nikiski AND new gas turbines to meet ALL base load, peak, and emergency demands what incentive how will we afford to buy significant amounts of renewable energy as new projects projects come on line?

The Legislature appropriated $7 million to fund a 5 MW reciprocating generator or a battery bank to allow HEA to integrate the 14.4 MW of power from the Kenai Winds project into the existing grid. Why won’t that solve the problem of “following” this intermittent source of energy?


Background:
HEA management outlines two phases for Independent Light. We are already committed to the first -- adding a steam turbine to the Nikiski gas plant and associated upgrades to the Nikiski substation. This is intended to meet the needs of so-called “base load and intermediate generation.” The second phase involves acquisition of energy for so-called peaking, reserve, and contingency demand. Three options are suggested by HEA management -- build new gas generators in Soldatna, purchase energy from other producers, buy existing generation facilities from Chugach Electric Association.

HEA management claims that “The ‘Independent Light’ plan, because of its flexibility and sole control by HEA, actually provides a better opportunity to accommodate future renewable energy sources.” This claim refers to increased ability to compensate for variable output from wind turbines. Unfortunately, HEA keeps reducing the amount of wind energy they are willing to utilize from potential sources like the Fire Island and Kenai Winds project.

HEA’s response evades another basic issue. After you’ve spent hundreds of millions on enough gas turbines to meet all base load and contingency needs, what incentive will there be to move to renewables -- and with so much debt, where would the money come from?

At the May 11 HEA Board meeting General Manager Brad Janorschke indicated that he felt it was only feasible to use around 4 MW from any wind farm. He didn’t explain why $7 million would no longer pay for enough standby battery or generation equipment to balance more wind energy as originally planned.

HEA Members Forum Update

“Deja vu all over again”
HEA plans to apply to the RCA for another 2% rate increase to take effect in July.

Easy Come, Easy Go
According to discussions at the May 11 Board and Committee meetings, 2009 HEA Board expenses exceeded the $30,000 budgeted by over $20,000. This was attributed in part to having so many new Directors needing training and to travel for lobbying and other utility related functions. President Debnam urged Directors to make flight reservations early in future to help reduce travel costs.

At the same time the Board approved plans to increase Director meeting stipends from $200 to $250 or $300 per day as of January 1, 2011. The separate $200 per day travel stipend was also reconfirmed.

The Truth, the Whole Truth
Among several Board Policy updates approved on May 11 was PB 221 Board of Directors Website Content. Under this policy Directors’ expenses will be published quarterly in the Kilowatt Courier and maintained on the HEA website. Other new items to be added to the website include Directors’ meeting attendance and voting records.

Don’t Ask, Don’t Tell
Board Policy 216, Designated Spokespersons, was approved on May 11 as well. This one directs that “All requests to the Board of Directors for information pertaining to action of the Board shall be directed to the President of the Board.” Does this worry you? Does it mean that your Board representatives are discouraged from communicating with you? Board President Debnam claims not -- “This policy was never intended to impede communication between Directors and HEA Members. I am proud to say that we have an extremely ‘member-focused’ board whose door is always open.”
The General Manager is designated spokesperson for anything related to operations of the cooperative.

Takes the Wind Out of Their Sails
HEA claims it would be too technically difficult to use all 14 + MW Kenai Winds LLC hopes to produce from its proposed Nikiski wind farm. Since wind power is intermittent and unpredictable utilities need to have other power to fill in during calm periods. While the $7 million appropriated by the Legislature was meant to provide money for a fix, HEA feels it still won’t be able to use much more that 4 MW of wind energy in the short term. HEA management and some Directors seem now to be leaning toward using the $7 Million to build our own, smaller wind farm -- assuming the Governor doesn’t veto the appropriation. Bait and switch?

Water Torture?
The Kenai Hydro isn’t dead. While it’s been pared down to one element, Grant Lake, HEA management is still hoping to move ahead with the project, in spite of ongoing opposition from area residents, Kenai watershed protection advocates, and a variety of Alaskan conservation groups. The Federal Energy Regulatory Commission has scheduled rush scoping meetings with comments due by early June. Notice includes a list of issues for consideration and a draft schedule for FERC’s analysis of the license application. The full document is available at www.ferc.gov, and has been posted at: http://www.kenaihydro.com/documents/index.php .

Jobs for Who?
As you probably noticed along ago, HEA has been outsourcing member billing. This change eliminated at least two local jobs but has proven efficient and cost effective. Nonetheless, it has caused a lot of heartburn among HEA members. The Board of Directors keeps getting complaints and now feels your pain. They are looking for ways to bring the work back to Alaska without increasing costs exponentially. No solutions yet, though.

Here Comes the Sun (and other stuff)
Don’t forget -- the Alaska Solar tour comes to the Kenai Peninsula tomorrow, Saturday, May 15. Go to http://www.alaskasolartour.org/ for more information.

Electric Coffee Table
Plan to tune in to next week’s Coffee Table Program on KBBI or KDLL (Wednesday, May 19, 9:00 AM). The focus will be all things HEA with guests Brad Janorschke and Joe Gallagher. This is your chance to ask some hard questions. Call 235-7721 on the southern peninsula, 1-800-979-7405 from elsewhere.

A special HEAMF alert will come your way soon with ideas for questions and comments.

Tuesday, April 20, 2010

Updates

Unlimited Debt
While HEA has a $450 million debt cap, it turns out the Alaska Electric and Energy Cooperative (AEEC), HEA's separate generation and transmission corporation. has none.
All major projects such as Independent Light take place under AEEC.

Being a completely separate legal entity, AEEC is not directly accountable to HEA members -- you have no rights or privileges with respect to it. AEEC meeting agendas are not published on the HEA website and, at least recently, most meetings have been closed to HEA members. You can only influence AEEC indirectly through appeal to HEA Directors. In a recent e-mail exchange, one HEA Director wrote, "I'm aware of the smoke-and-mirrors aspect of that distinction with AE&EC being a one-member co-op, but that is the legal structure. That said, HEA+AE&EC's debts don't and won't exceed HEA's debt cap."

Getting Steamed Up
On April 6th AEEC approved a $5,017,900 design contract for addition of a steam turbine to the Nikiski facility. The contract has been awarded to Stanley Consultants, Inc., an Iowa-based company. This is the first step in implementing the Independent Light project. Most sources seem to agree that retrofitting the Nikiski plant for cogenration makes technical and economic sense. There is room, however, for significant disagreement over plans to follow up with installation of two new single cycle natural gas gererators in Soldotna.

HEA Website Upgrades
At the April 6 meeting, the HEA Operations committee approved our request that HEA Board Policies be posted on the website. They are available at http://www.homerelectric.com/ by clicking Board of Directors and Elections/Board Policies on the left side menu. You will see that bylaws, the district map, a meetings calendar and other Board related information are available there as well.

Unfortunately, so far none of our suggestions for improving the Independent Light Frequently Asked Question page have been acted on and our responses to answers posted there have not been addressed.

HEA Board Perks
You may have read the recent Peninsula Clarion article on HEA Board Reimbursements (April 9 -- $140,000 in director payments in 2009). This is a valid topic for discussion. Throughout the country there have been examples of rural electric cooperative Boards of Directors partaking of unethical and insupportable levels of payment, often amounting to millions of dollars. Is $140,000 excessive? One would need to look closely at how the money was used. HEA Directors are expected to put in an enormous amount of time and asked to travel often on behalf of the cooperative. Most join the Board with limited knowledge of energy issues or the workings of a utility. Professional development workshops and classes help them develop a working understanding to underpin decisions they are asked to make. The $200 per meeting stipend is among the lowest in the state yet the Board recently voted against increasing it. In addition to this stipend, tuition for professional development courses, travel and lodging for HEA business trips and reimbursement of related out of pocket expenses account for part of the money spent on Directors. Can this process be abused? Probably. Perhaps it would be helpful to HEA members concerned about this issue if HEA took steps to clarify how a budget is determined for these activities, how priorities for which events Directors should participate in are set, and what safeguards are in place to guard against abuse.

Net Metering
Although the RCA is still waiting for the State Attorney General to sign of on the Net Metering standards approved in January, HEA is moving to transition from from SNAP to net metering. HEA filed a net metering tariff with the RCA requesting immediate implementation and may be the first railbelt utility to have done so. May 27 is the earliest expected date for RCA approval.

Renewable Energy
An April 6 presentation by Chris Rose of the Renewable Energy Alaska Project (REAP) to the HEA Operatins Committee on Alaska's renewable energy potential was well received. There was specific reference to how HEA and other railbelt utilities can work toward incorporating renewables into their energy mix. HEA Directors showed interest in the potential of Mt. Spurr geothermal and Lake Chakachamna Hydroelectric projects and in tidal generation technology. Unfortunately, there was no discussion of how HEA would integrate the Independent Light project with these sources should they become available. Chris was invited to return and report after taking a first-hand look this spring at a tidal power prototype off the coast of Ireland.

HEA continues to consider how to utilize power from the Fire Island wind farm and Nikiski Kenai Winds projects when they come on line. Because wind power is intermittent it poses problems of load balancing and dispatch that are challenging. Studies of potential sites for small wind projects on the southern peninsula are ongoing. The Grant Lake component of the Kenai Hydro project is still being considered, though it will require additional funding before significant effort can take place.

GRETC on the Ropes
At the April 13 HEA Board meeting the consensus of Directors was that legislation to create a Greater Railbelt Energy & Transmission Corporation (HB 182, SB 143) will not pass the legislature this session. We suspect this is correct. The issue is very complicated, involving a complete reorganization in the way all railbelt utilities and regulators would operate. While both ratepayers and utilities have stated support for the concept of a GRETC, it's become clear that the two interest groups do not agree on some very basic elements and the RCA recently weighed in with it's own questions and reservations. The HEA Board still wants to work with other railbelt utilities and the next legislature on GRETC legislation.

Thursday, April 1, 2010

Ken Hepner's HEA Board Campaign Needs Our Help NOW

It is difficult to unseat an incumbent. Ken is running against HEA Board President Debbie Debnam who supported the Healy 2 coal plant deal and continues to support the questionable Kenai Small Hydro project and lots of Board executive sessions. We are told she is being supported by a powerful group of political insiders including Borough Mayor Dave Carey, Hugh Chumley, and HEA General Manager Brad Janorschke.

HEA Ballots will be mailed tomorrow. Past experience shows that most people mark and return their ballots within to following week or ten days.

Please volunteer to help by placing a Ken Hepner sign on your property (central peninsula folks), or for the phone tree (central AND southern peninsula folks).

Contact Ken or his campaign managers to volunteer.
Ken: hepner(email@)alaska.net or 262-8510
Campaign managers: Dan Chay chay(email@)alaska.com,
Robert Ruffner robert.kwf(email@)gmail.com

Election Update

HEA Members Forum Supports Ken Hepner and Tony Garcia For HEA Board of Directors

These two candidates support more open governance of our cooperative -- fewer closed-door meetings; more information about operations, plans, problems; responsiveness to member concerns. Both want to embrace renewable energy while making efficient use of remaining natural gas reserves. See their candidate statements below.

HEA Ballots will be mailed to members tomorrow, Friday, April 2, 2010.

HEA District 1 -- Vote Tony Garcia.

HEA District 2 -- Vote for Ken Hepner.

HEA District 3 -- Call central peninsula family, friends, associates and encourage them to Vote for Tony or Ken.

(Bill Fry is running unopposed in District 3 and need not campaign.)

Ken Hepner
I am Ken Hepner, a retired science and math teacher, United Methodist Minister, and an experienced office manager. My wife and I raised our daughter and lived here for 27 years. Transitioning to a renewable future, we should use Cook Inlet natural gas more efficiently and forego coal-fired generation due to costs, regulatory uncertainties and mercury emissions. I am running for the board because I want HEA to pursue cleaner renewable power generation.

HEA sits on world class tidal, wind and geothermal resources. HEA should be installing wind turbines (mature technology), and exploring tidal and geothermal. I bring knowledge about fishery issues, and support hydroelectric projects when appropriate; however, I would not have pursued hydro-development of Ptarmigan Creek in the headwaters of the Kenai River.

During my 16 years of service with the Central Emergency Service board and while
employed with Kenai Peninsula Schools, I worked with multi-million dollar budgets. My work with Native Ministries involved working with a variety of backgrounds and
cultures.

I support more transparency and fewer closed-door executive sessions. HEA should
better educate its members about the challenges ahead and listen to your concerns as we work toward a secure energy future. Thanks for your support!


Tony Garcia
I, Tony Garcia, have been a member of Homer Electric Association
since 2000.

My board experience includes service on the Homer Electric Association board since
2008, Kenai Care Center since 2007, and the Alaska Dare Officers Association since
2004. Additionally, I am the state chairperson for the Elks Drug Awareness committee.

My work experience includes the United States Air Force (retired Senior Non
Commissioned Officer after 21 years of service in 2003) and Soldotna Police Department from 2003 to present, currently serving as a Patrol Sergeant.

If elected to represent the members of Homer Electric Association, my main goal will be to provide the best possible service to all, provide the highest value services at the lowest practical cost, to keep members informed about their co-op’s operations, plans, problems and progress. Promote democratic process ensuring transparency and encourage members’ participation and to diversify our energy portfolio by integrating renewable resources.