Showing posts with label meeting. Show all posts
Showing posts with label meeting. Show all posts

Thursday, June 28, 2012

Special Alaska Electric & Energy Cooperative Board Meeting

Special Alaska Electric & Energy Cooperative Board Meeting
9:00 AM
Friday, June 29, 2012

Kenai HEA Board Room (
video conferencing from Homer offices)

This special meeting of HEA's generation and transmission arm was called to discuss and vote on approval of a contract for the Soldotna power plant construction, Phase 3 (Combustion Turbine Installation).
 The meeting is expected to last 30-45 minutes with the bulk of it in Executive Session.  

Tuesday, April 24, 2012

Have You Voted That HEA Election Ballot?


If so, give yourself a pat on the back. 

If not, you still have time. 

Mail-in ballots must be received by HEA no later than May 2. 

Elect capable, responsible, Directors to the Homer Electric Association Board.


David Thomas (District 1)    Ed Oberts (District 2)    Jim Levine (District 3)

HEA Members may also vote in person at the Annual Meeting on May 3 at Homer High School.

Tuesday, January 10, 2012

Regular HEA/AEEC Meetings

Regular HEA/AEEC Meetings
Tuesday, January 10, 2012


10:00 AM -- Operations and Special Projects
1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Warning: On the meeting calendar page of the HEA website when you "hover" the cursor over a meeting title an incorrect time is displayed. For example, 9:00 AM will be shown as the Operations Committee starting time. Click on the meeting title to get the right time.

Location: Meetings take place in the Kenai Offices at 280 Airport Way. Video conferencing is available in the Homer Offices at 3977 Lake Street, 907-235-8551. Draft agendas are available on the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx
. There are sometimes last minute changes in scheduling, so check the website.

Electronic Voting
Resolution 45.2012.02, proposing an amendment to HEA bylaws to allow electronic voting in annual elections is on the January 10 Operations Committee and HEA Board meeting agendas. If passed, an electronic voting option would not eliminate traditional paper ballots. At the October meeting, Operations Committee Chairman Jim Levine reported  members' concerns about potential vote tampering.  Hopefully, if electronic voting is approved, effective protection against hacking and vote manipulation will be incorporated into the system. If you are interested in this topic you should attend the 10:00 AM Operations Committee Meeting.

Energy from Garbage (thanks to Sustainable Homer for this reminder)
Wednesday the 11th:  REAP Forum: Anchorage Landfill Methane Power Plant  Get the live podcast online at: https://www1.gotomeeting.com/register/830056584 to hear from 6-8pm about the latest on Alaska's FIRST EVER Landfill Methane Power Plant, which in 2012 will tap methane produced by the Anchorage Regional Landfill to power Joint Base Elmendorf Richardson (JBER). There are many such plants around the country, but this will be the first in Alaska. Their speaker will be MARK MADDEN, Solid Waste Services Director for the Municipality of Anchorage. More info:  907.929.7770, www.REalaska.org
New HEA Rate Structure
If you received your January HEA bill you probably noticed the new rate structure. The components of residential electric bills include:

New customer charge -- $15.00
New Blended energy charge -- 16.917 cents per kWh (HEA base rate + Cost of Power Adjustment)
Regulatory charge
Sales tax

The $15.00 customer charge is a bit low. It covers less than half the amount the RCA allows a utility to charge for its fixed costs (basically, everything needed to provide service to a customer except the electricity). This leaves HEA still recovering a large part of those fixed costs through the per kWh energy charge. That's why the monthly 150 kWh minimum energy charge was added. The minimum is really just an additional, but variable, customer charge disguised as an energy charge. That's why the RAPA and the RCA were reticent to approve it. When they finally did, the RCA capped the combined minimum energy charge and customer service charge at $38.38. HEA can't exceed that amount no matter how much the per kWh energy rate increases without going back to the RCA.

According to HEA the typical residential member uses an average 630 kWh a month and will see a 7.2% decrease in their bill under the new plan. The lowest consumption members will see an increase in their rates, however. See the news story at http://homernews.com/stories/010412/news_nhrpa.shtml#.TwovSSNqNZg or the HEA press release at http://www.homerelectric.com/ for more information.

Renewable Energy Money for HEA Members
HEA has offered relatively low interest loans (up to $5,000) through its "Line of Credit Program" for a number of years.  These are designed to help members upgrade to more efficient appliances, improved electrical and plumbing systems and much more. At the December Board meeting, small scale renewable generation equipment and services were added to the list of acceptable uses for the loans. Learn more about the program at http://www.homerelectric.com/Residential/HEALoanProgram/tabid/93/Default.aspx.

Heating with Lower Cost Off-peak Electricity
HEA General Manager Brad Janorschke has proposed investigating an Electronic Thermal Storage (EST) pilot program for 2012. It would enable members to offset higher cost propane and fuel oil with lower cost off-peak electricity. Off-peak energy sales allow dispatchers greater flexibility in maximizing system efficiency. For example, shifting demand from peak use hours to lower demand times can avoid the need to fire up additional generation or purchase power from other producers -- both expensive options. This strategy was not a practical option under HEA's present power purchase agreement with Chugach Electric Association, however. Once HEA is generating most of our power, reduced off-peak electric rates become a real possibility. 

ETS units are designed to be used as energy storage devices that can help us incorporate fluctuating renewable energy resources like wind power by evening out and balancing energy demand. An out-of-budget expenditure will be presented to the HEA Board for approval prior to proceeding with the project. If you are interested in this kind of project you should attend the 5:30 PM HEA Board meeting to ask questions and tell the Board what you think.

Thursday, August 18, 2011

HEA Members Forum Update


THERE WILL BE A SPECIAL MEETING OF THE HEA BOARD OF DIRECTORS

THURSDAY, AUGUST 25, 2011  at 10:00 a.m.


Notice is hereby given that a Special Meeting of the Board of Directors of Homer Electric Association, Inc., pursuant to Article V, Sections 2, 3, and 6 of the Homer Electric bylaws, will be held at 10:00 a.m. on Thursday, August 25, 2011 at 280 Airport Way, Kenai, Alaska. The purpose of the meeting is to consider authorizing the General Manager to proceed in the application process to seek grant funding for the Kenai Hydro, LLC Hydroelectric Dam Project.

Video conferencing will be available in the Homer Offices at 3977 Lake Street, 907-235-8551.
Information and perspective on this project is available on these websites:


http://www.kenaihydro.com/index.php

http://akcenter.org/forests-and-wildlife/chugach/kenai-hydro

Thursday, January 13, 2011

HEA Members Forum Update

January HEA/AEEC Meetings
These meetings will take place in Kenai at the Central Peninsula Offices, 280 Airport Way. Video conferencing is available in the Homer Offices at 3977 Lake Street.

Tuesday, January 18, 2011 (tentative)
10:00 AM -- Operations and Special Projects

1:00 PM -- Finance Committee
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Check for meeting calendar updates and draft agendas on the HEA website at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx.

No More Secrets for Now
Last November HEA/AEEC filed a petition with the Regulatory Commission of Alaska to classify it’s 2010 Equity Management Plan as confidential. This would keep a lot of information about how the coop conducts business out of the hands of HEA members -- or anyone else for that matter. Several HEA members followed up with a request for a stay pending resolution of a previously filed informal complaint. On December 17, 2010 the RCA denied the HEA/AEEC petition for confidentiality (U-10-85, Order No. 2). The coop may reapply if willing to supply meaningful justification for such blanket confidentiality.

HEA/AEEC Rate Plan on Hold
The proposed new rate design was filed with the RCA on November 9, 2010. Under the plan, the present $11.00 monthly residential customer charge would increase to $15.00 and a minimum monthly 150 kWh energy charge would be added. After receiving 22 public comments, all but one opposing the plan, the RCA suspended the HEA/AEEC request for approval (Order U-10-97, Order No. 1). The December 17, 2010 stay requires HEA/AEEC to submit a brief addressing how the proposed “minimum energy charge” complies with relevant Alaska Administrative Code. It also schedules further investigation, invites petitions to intervene from interested parties and participation by the Attorney General, and appoints an administrative law judge to conduct the docket. The deadline for petitions to intervene is 4 p.m., January 18, 2011. A prehearing scheduling conference for the matter will be held in the Commission’s East Hearing Room at 9 a.m. on February 4, 2011. Go to the RCA website at http://rca.alaska.gov/RCAWeb/Entity/EntityDetails.aspx?id=883fd287-5437-45c3-ac93-6611db2d87b0 for documents relating to HEA/AEEC.

WPCRA vs. COPA -- Say What?
Given the RCA stay of HEA/AEEC’s proposed rate plan this might be moot but here goes anyway. One of the complaints against the rate plan was a move to replace the Wholesale Power Cost Rate Adjustment (WPCRA) with a Cost of Power Adjustment (COPA). Remember, the WPCRA is that fluctuating cost HEA has to pay for energy, mostly reflecting the price of natural gas. It’s passed through to you. According to a December 6, 2010 letter from RCA staff, unlike the WPCRA, the COPA would allow HEA/AEEC to change rates associated with fuel and purchased power absent the normal RCA rate proceeding. It looks like going to the COPA would result in an instant rate increase as well. When the new rate plan was presented to HEA members the WPCRA was less than one cent (.00715) per kWh. The figure given for the COPA under the new plan was 2.862 cents per kWh -- much higher. What extra things does it include? While this information has been requested many times, there has as yet been no side-by-side comparison of these two computations. HEA’s Joe Gallagher is trying to get this for us but has so far been unable to deliver.

Independent Light $$
Phase One of the Independent Light project, upgrade of the Nikiski plant, is proceeding as planned according to the December 14, 2010 update from the HEA/AEEC engineering staff. At that time design work was 90 percent complete and construction bids were expected to go out last month. A contract should be awarded in February 2011, work should be completed by 2012, and the new steam turbine should be in commercial operation by the 4th quarter of that year. This upgrade is expected to improve efficiency of the plant by 40 percent without burning any extra fuel, allowing it to generate most of the baseload requirements for the HEA/AEEC service area.

Phase Two of the project, addition of new gas generation facilities at Soldotna to supply “peaking” and reserve energy, is moving forward as well. Additional property has been purchased at the old “Soldotna 1” site, Stanley Consultants was awarded a contract for up to $3,300,000 for facility design, and purchase of one gas turbine generator for approximately $22,700,000 was authorized. HEA/AEEC Directors declined to authorize purchase of two units as originally envisioned by management. Discussion of the enabling resolution (10-34) indicated that some Directors have misgivings about investing so much money in new natural gas hardware and would like to investigate other renewable energy sources. This decision will be revisited in the near future.

Cook Inlet Natural Gas Storage Alaska (CINGSA)
With diminishing Cook Inlet natural gas supplies, keeping the heat and lights on during winter cold snaps is becoming iffy. This is a growing concern for HEA/AEEC, especially with at least one new gas turbine slated for Soldotna. As a partial solution, CINGSA proposes an underground storage facility in Kenai to hold natural gas during times of low demand and then withdraw the gas during peak demand (winter). At the December 14, 2010 HEA/AEEC meetings AEEC Resolution 10-31 was approved authorizing HEA General Manager Janorschke to sign a contract committing HEA/AEEC as a customer of the CINGSA project. Other CINGSA customers include Enstar, Municipal Light and Power of Anchorage, and Chugach Electric Association. If the project is successfully developed HEA/AEEC commits to a 20-year contract. The coop would pay monthly fees for its share of storage capacity and the amounts of gas it injects or withdraws. It will also need to supply (purchase) gas and pay for the energy used to inject or withdraw it. There will be added charges if amounts of gas stored, injected, and withdrawn exceed that allowed by the contract. While speculative, estimates of cost to HEA/AEEC range between $900,000 and $1,988,000 per year.


AEEC Board Meeting Minutes and Voting Record
A small concession was won at the December 14, 2010 HEA/AEEC meetings. In response to a HEAMF request, Directors approved a motion to start posting Alaska Electric and Energy Cooperative Board meeting minutes on the HEA website as is already done for HEA Board meetings. This is important because the minutes contain a record of how Directors vote on various resolutions. It’s one way for HEA members to evaluate Director performance and make good decisions at annual Board elections. But more needs to be done.

Since inception in 2002 the AEEC has been more or less invisible to HEA members. There is little information provided on the HEA website -- only meeting notices and agendas. Considering that the present conversion from a distribution utility to a generation &transmission utility is likely the largest, most costly event in our coop’s history and is being accomplished primarily through the AEEC, this seems like a significant omission. For some time we have requested that HEA fully disclose and explain to members the HEA/AEEC relationship. This should include posting of AEEC organizational documents such as bylaws, Board policies, Board member information, and other pertinent materials on the HEA website -- or on a new AEEC site. HEA members are not also AEEC members. AEEC has no debt limit. Consequently, it should be made clear how HEA members can have a voice in AEEC affairs, what measures are in place to prevent unlimited borrowing through the AEEC, and what checks and balances preclude bad decisions by those who conduct AEEC business.

Monday, September 13, 2010

This Week's HEA/AEEC Meetings


These meetings will take place in Kenai at the Central Peninsula Offices, 280 Airport Way.

Tuesday, September 14, 2010
9:00 AM -- Operations and Special Projects
1:00 PM -- Finance Committee
3:30 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Download draft agendas at http://www.homerelectric.com/BoardofDirectorsElections/BoardMeetingInformation/Agendas/tabid/220/Default.aspx.
Video conferencing is available in the Homer Offices at 3977 Lake Street.

Next Week's Area Meetings
The proposed new rate structure will be the main focus of the General Manager's presentation.

Anchor Point, 5:30 PM, Monday September 27, Chapman School
Kasilof, 5:30 PM, Tuesday September 28, Tustumena School
Sterling, 5:30 PM, Wednesday September 29, Senior Center
Nikisiki, 5:30 PM, Thursday September 30, Community Center

These meetings are typically a venue for HEA management to express it's point of view in a controlled situation, absent divergent outlooks. Free food and the promise of drawing prizes seem to be uppermost in attending HEA members' minds. Nonetheless, it is an opportunity for you to raise questions and express your own opinions regarding any HEA issue.

Thursday, August 12, 2010

August HEA Meeting Schedule

All meetings will take place in the Board room of the HEA offices in Homer at 3977 Lake Street. Video conferencing is available at the HEA offices in Kenai at 280 Airport Way. Meeting agendas can be found on the HEA website at http://www.homerelectric.com/. Contact Joe Gallagher at jgallagher (email at) homerelectric.com or 907-283-2324 for more information.

Tuesday, August 17, 2010
10:00 AM -- HEA Operations Committee Meeting
12:30 PM -- HEA Finacne Committee Meeting
3:00 PM -- AEEC Board Meeting
5:30 PM -- HEA Board Meeting

Wednesday, August 18, 2010
9:00 AM Final Ratemaking Presentation by Consulting Firm RW Beck

Monday, February 15, 2010

HB31 THREATENS NET ENERGY METERING

Testimony will be taken Tuesday, Feb. 16th starting at 3pm at the House Special Committee on Energy hearing on HB 31 .

Louie from Representative Seaton's office thinks they plan to try and put the new RCA regulation language into HB 31. That would make net metering entirely voluntary for the utilities. Under HB 31, cooperatives organized under AS 10.25 are exempt but may waive exemption if the majority of its membership votes in favor of the waiver. Louie thinks this is a backhanded attempt by the utilities to undo net metering regulations passed by the RCA January 15.


Net metering fans will want to testify against this.
The utilities previously testified on the record that Net Metering should be investigated by the RCA and not the legislature. This could be brought up if there are a bunch of utilities testifying on the issue.


If you can attend, please let the LIO know.

Homer Legislative Information Office
345 W Sterling Hwy, Ste 102A
Homer, AK 99603
Phone: 235-7878 Fax: 235-4008

Kenai LIO
145 Main St Lp, Ste 217
Kenai, AK 99611
(907)283-2030/phone (907)283-3075/fax

email: Kenai_Lio(email@)legis.state.ak.us

Tuesday, January 12, 2010

HEA Extends Application Deadline for Board Appointments (& more)

HEA Extends Application Deadline for Board Appointments
At yesterday's HEA Operations Committee meeting the Board voted to extend the deadline to apply for the vacant seats until January 22. So far there are five names on the list of applicants. HEAMF is making an effort to learn enough about each person to recommend which seem most qualified. If you are interested in applying you must be a resident of HEA District 3. Applications are available on the HEA website (http://www.homerelectric.com/) or at HEA offices in Homer and Kenai. They must be returned by Friday, January 22, 2010 at 5 PM. Contact Teresa Gamble at 283-2334 or tgamble(email@)homerelectric.com for additional information.

Net Metering
The Net Metering Regulation adopted by the Regulatory Commission of Alaska (RCA) in October was sent to the Alaska Department of Law for review. It could be signed into law by March 2010. The next step is for the RCA to adopt regulations governing how to tie your alternative energy system to the electric grid. The RCA will probably schedule a workshop on interconnection for some time in February. Public notice must be given 30 days before the workshop. Look for Matter Number: R-09-002, Consideration of the Adoption of Regulations Implementing an Interconnection Standard, on the RCA website (http://rca.alaska.gov/RCAWeb/home.aspx).

Operation "Independent Light"
This is HEA's alternative to the Healy 2 coal plant. The plan includes adding a Steam Turbine Generator (STG) at Nikiski to take advantage of waste heat (formerly used by the now closed Agrium plant). This would greatly increase the electricity produced without burning any added fuel. In addition, a new natural gas fired generation facility would be installed in Soldotna to generate even more power. Finally, appropriate upgrades would be made to existing substations at each location. A pre-bid conference was held for interested vendors in November and bids are due back by January 15. HEA staff hopes to conduct bid evaluations and make a recommendation to the full Board by late January or early February.

None of this comes cheap. HEA will need to borrow as much as $130 million to complete all parts of this proposal. Watch for more information on this in coming updates.

Alaska Railbelt Regional Integrated Resource Plan (RIRP) Report
This study was commissioned by the Alaska Energy Authority to help assess and guide railbelt utility planning for the next 50 years. The report is long and comprehensive but, in addition to recommending that the Healy 2 plant remain mothballed, includes the following among its general recommendations:

1. The State should work closely with the utilities and other stakeholders to make a decision regarding the formation of GRETC [Greater Railbelt Energy and Transmission Company]and to develop the required governance plan, financial and capital improvement plan, capital management plan and transmission access plan, and address other matters related to the formation of the proposed regional entity.

2. The State should establish certain energy-related policies, including:
o The pursuit of large hydroelectric facilities
o DSM/EE [Demand Side Management/Energy Efficiency] program targets
o RPS (i.e., target for renewable resources), and the pursuit of wind, geothermal, and tidal...projects in addition to large hydroelectric projects
o System benefit charge to fund DSM/EE programs and or renewable projects

The whole report can be downloaded from the Alaska Energy Authority website (http://www.aidea.org/AEA/regionalintegratedresourceplan.html).

Monday, January 4, 2010

HEA Board Appointments on Fast Track

With the recent resignation of long-time HEA Board member Mike Pate, two of three southern Kenai Peninsula seats are vacant. The Board is moving fast to appoint replacements for Brian Hirsch and Mike Pate. With only Jim Levine left to represent HEA members from Kasilof south, the central peninsula now dominates HEA policy. Consequently, the six central peninsula Directors will determine who represents the interests of southern peninsula HEA members.

So far, all previous applicants for Brian Hirsch’s seat are being considered for the vacancies. HEA has also issued a call for others to apply by the end of this week -- Friday, January 8 by 5 PM. The Board plans to conduct interviews and make their decisions by the January 12 full Board meeting.

Given that the Holiday season still isn’t over for some HEA members, this schedule seems short. With all the seasonal celebrating it’s likely that some potentially excellent applicants aren’t even aware of this new opportunity to vie for a Board seat. At least one of the applicants already on the list is traveling and cannot be reached with notification that the appointment process has resumed.

Why not extended the deadline two weeks so that southern peninsula HEA members have more of an opportunity to see the best possible people are appointed to represent them on the HEA Board?

And why not consider throwing your hat in the ring? Applications are available on the HEA website (http://www.homerelectric.com/) or at HEA offices in Homer and Kenai. They must be returned by Friday, January 8, 2010 at 5 PM.

This and other important issues will be discussed at tomorrow’s (January 5) HEA Operations Committee meeting starting at 11 AM. Southern peninsula members can video conference from the Homer HEA offices. If you can’t attend why not take a few minutes to request that the Board extend the application deadline for a couple of weeks.

Deborah Debnam
debbie(email@)debnam.com / 907.262.9277
District 2 - Sterling; Term Expires 2010

Tim Evans
heatde(email@)gmail.com / 907.262.3734
District 2 - Sterling; Term Expires 2011

David B. Thomas
davidthomashea(email@)gmail.com / 907.283.4109
District 1 - Kenai; Term Expires 2011

Eugene "Jim" Levine
jlevine(email@)homerelectric.com / 907.299.0323
District 3 - Homer; Term Expires 2012

Jose "Tony" Garcia
tonygarcia43(email@)hotmail.com / 907.252.7790
District 1 - Nikiski; Term Expires 2010

Alan Bute
byrdave(email@)yahoo.com / 907.776.8115
District 1 - Kenai; Term Expires 2012

Ed Oberts
eoberts(email@)gci.net / 907.398.8039
District 2 - Soldotna; Term Expires 2012

Thursday, October 22, 2009

HEA and Self Regulation

The attached letter went to the HEA Board of Directors and General Manager Janorschke yesterday. I am told that self regulation, or as HEA frames it, "local control" will be discussed at the November 3 Board Meeting in Kenai. Should this issue move forward you will be asked whether or not to give up regulatory oversight of our coop. This would perhaps be the largest structural change in HEA's history. It is in your interest to see that the issue is fully explained to your satisfaction prior to any such vote. One way to do this is to attend the next Board meeting in Kenai or via video conference from the Homer HEA offices.

If you like, you can also e-mail your sentiments regarding the process HEA should use to explore this issue.

Deborah Debnam, President debbie(email@)debnam.com
Tim Evans, Vice President heatde(email@)gmail.com
David B. Thomas, Secretary/Treasurer davidthomashea(email@)gmail.com
Eugene "Jim" Levine, Deputy Secretary jlevine(email@)homerelectric.com
Jose "Tony" Garcia tonygarcia43(email@)hotmail.com
Alan Bute byrdave(email@)yahoo.com
Ed Oberts eoberts(email@)gci.net
J. Michael Pate Mike_Pate(email@)wellsfargois.com

Brad Janorschke, General Manager bjanorschke(email@)homerelectric.com

HEA Considers "Self Regulation"

The HEA Board is taking steps toward becoming "self regulated." What does that mean? At present HEA, like most moderate to large Alaska electric utilities, operates under the oversight of the Regulatory Commission of Alaska (RCA). The RCA was established to see that utilities adhere to state laws and regulations and operate in a fair and fiscally responsible manner. As part of it's mission, the RCA works to mitigate differences between utilities and help protect consumers. However, Alaska law allows utilities to opt out of RCA oversight by a vote of the member/ratepayers. Under self regulation, the HEA Board would be free to conduct business absent any oversight except that of the member/ratepayers (that's us).

At this month's community meetings HEA members are being asked to complete a short opinion survey (attached) regarding how they might feel about getting the coop out from under RCA purview. Of course, most members probably don't know much about the RCA or what it might mean if they vote to opt out.

This is a significant issue for all HEA members. You should become informed as quickly as possible so that you understand how such a change could affect you.

Is "self regulation" good or bad for us? That probably depends on how much confidence and trust you have in our HEA Board and management.

From discussion at Tuesday's Board meeting, it appears that a majority of the HEA Board favors moving to "self regulation." They feel that our coop could operate more efficently and cost effectively without RCA oversight. To be sure, the workings of the RCA are typically ponderous, time consuming, and sometimes frustrating. Is there anything to lose by dropping out? Perhaps not. Although one thing come to mind right away -- under "self regulation," the new Alaska net metering rule would not apply to HEA. But without more information, it's difficult to know if other problems might arise.

At Tuesday's meeting HEA Board members and General manager Janorschke discussed the importance of providing HEA members with good information about the reasons for, the process, and potential outcomes of a transition to "self regulation." Hopefully this would be more than a sales pitch.

It's up to us to require a frank and open examination of the potential risks and benefits of such an enormous change well before we are asked to vote.

Tuesday, May 12, 2009

Update from Board Meeting!

Today (May 12, 2009) the HEA Board of Directors voted to "...direct the
General Manager to cancel the RFP for the Power Supply Study and
transition our cooperative away from involvement in HCCP" [the Healy 2
coal plant]. The process of withdrawing from preliminary commitments to
Healy 2 may require a little time but, when questioned about it, 2 board
members confirmed that the intent is to end HEA's involvement with plans
to restart the Healy 2 plant.

Director Tim Evans made the motion to start the process of disengaging
from the Healy 2 project. It was adopted by a vote of 8 to 1. The single
opposing vote represented concern over discontinuing the Power Supply
Study and did not reflect support for Healy 2.

Member/Owners Needed to Attend Meeting

Tuesday (May 12) starting at 5:30 PM in the Homer Offices.
(HEA Board Meetings will be held at the Homer offices May through August)

It would be good for the HEA Board to see a number of ratepayer/members at Tuesday’s meeting.

The Board needs to know that we are not satisfied with Brad Janorschke’s failure to provide good information on the status of Healy 2 negotiations, the Power Supply Study, and small hydroelectric proposals at the Annual Meeting of members. Just see you there reminds them that we are still watching.

It would also be a good opportunity to welcome the newly elected Board Members and encourage them to support more open governance of our coop. You can talk to anything on the agenda early in the meeting (agenda item 4). Other comments will need to wait until later (agenda item 11).

Tuesday’s meeting agenda is pasted below. Hope some of you will find time to join us.

HOMER ELECTRIC ASSOCIATION, INC.
REGULAR BOARD MEETING
May 12, 2009
5:30 p.m.
Homer, Alaska

A G E N D A
1.Call to Order
A)Pledge of Allegiance
B)Roll Call
C)Election of Officers (if needed)

2.Changes to the Agenda

3.Business of Visitors

4.HEA Member Comments upon Matters on the Agenda

5.Adoption of the Consent Agenda
A)Approval of Minutes: Regular Meeting of April 14, 2009
B)Resolution 09-21, Capital Credits Payment to Estates

6.Correspondence

7.Manager's Report (no exhibit)

8.Committee Reports
A)Operations and Special Projects, David Thomas, Chair
B)Finance, Audit, Rate and Planning, Don Seelinger, Chair
C)APA Report, Debbie Debnam, Board Member (remittance options)
D)Railbelt Utility Task Force, Mike Pate or Tim Evans

9.Unfinished Business
A)Acceptance of February Financial Reports
B)Audio Conferencing Options (presentation)
Board Meeting Agenda Homer Electric Association, Inc. Page 2

10.New Business
A)Resolution 09-22, Scholarship Winners
B)Resolution 09-23, Simplified Rate Filing for the Test Year Ending March 31,
2009

11.General Comments of HEA Members

12.Comments and Discussion by Board Members

13.Calendar Review

- May 12, 2009 / Homer Board Room
12:30 p.m. - Lunch
1:30 p.m. - RW Beck Workshop
3:30 p.m. - AEEC Annual Meeting
3:40 p.m. - AEEC Board of Directors' Meeting
5:30 p.m. - Board of Directors' Meeting

- June 9, 2009 / Homer Board Room
2:00 p.m. - Operations Committee Meeting
3:30 p.m. - Finance Committee Meeting
5:30 p.m. - Board of Directors' Meeting

- July 14, 2009 / Homer Board Room
2:00 p.m. - Operations Committee Meeting
3:30 p.m. - Finance Committee Meeting
5:30 p.m. - Board of Directors' Meeting

- August 11, 2009 / Homer Board Room
2:00 p.m. - Operations Committee Meeting
3:30 p.m. - Finance Committee Meeting
5:30 p.m. - Board of Directors' Meeting

OTHER MEETINGS

- May 27, 2009............................................
4:00p.m. - CEA Board Meeting

- June 24, 2009...........................................
4:00p.m. - CEA Board Meeting

- August 5-7, 2009 - Kenai/Soldotna...... APA Annual Meeting

14. Adjournment

Monday, May 4, 2009

Alaska Coal Workshop

Wednesday May 6th, 2009
Homer
Islands and Ocean Visitors Center 7-9 PM


Join Goldman Prize award winner Judy Bonds and acclaimed lawyer Joe Lovett as they share lessons learned from fighting the destructive impacts of coal strip mining and coal power plants in Appalachia and the Southeast United States. Bonds and Lovett will pull back the curtain on the myth of “clean coal.”

Get information and tools needed to protect our lands, waters, fisheries and sustainable jobs.

Invite family and friends along to hear these two remarkable speakers discuss the true costs of coal!

Sunday, May 3, 2009

HEA Board candidate Jim Levine

HEA Board candidate Jim Levine shares HEA Members Forum’s two major objectives:

1. Replace the present policy of exclusion and secrecy by HEA Management and Board with open governance offering greater opportunity for member participation.

2. Move HEA toward a fossil fuel free grid through increased efficiency, embrace of renewable energy technology, prompt phase-out of natural gas & oil, rejection of coal, and greater collaboration with other “railbelt” utilities.

Jim also has the professional expertise and organizational experience to effectively advocate for us during HEA Board policy discussions.

If you haven’t already done so, you can vote for Jim Levine at the Annual HEA Meeting on Thursday, May 7 at Homer High School.

Friday, February 13, 2009

Congratulations Everyone!

After a rather contentious start, Tuesday’s HEA Board meeting resulted in action to respond to member concerns over the proposed Healy 2 deal with AIDEA and GVEA.
At least 55 members crowded Homer and Kenai HEA offices to express their views. In over two hours of testimony, all but three or four opposed involvement with Healy 2 for a variety of reasons, from environmental to public health and economic questions. Many thanks to all of you who were able to participate and to everyone who sent comments to the Board.

It was a long meeting but, in the end, the HEA Board passed a motion by David Thomas to issue an RFP for a comprehensive, third-party, revised power supply study. It will examine Healy in relationship to all other power options available for meeting HEA’s power needs. Cost/benefit assessment of the various options will be an element of this study. Future fuel costs, regulatory issues, reliability, and potential impact on rates will be among the things considered.

In response to a recommendation by General Manager Brad Janorschke, this process will be conducted by the Generation Committee. Two Board members and three member/ratepayer representatives (1 from each Board district) will work with HEA staff to develop and oversee the RFP and the estimated six month power supply study process.

Unfortunately, the Board did not preclude continuing contract negotiations for a Power Sales Agreement between HEA and GVEA. Still, it would be hard to imagine HEA attempting to sign such a document absent results of the completed study.

Many significant issues remain regarding the way our electrical cooperative does business but HEA Board members deserve words of encouragement for taking a significant step in response to member concerns.